Similar Projects
Last Updated | 07/05/2021 04:09 AM |
Project Title | Econlockhatchee Trail Parallel Water Main |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL (Orange County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,079,498 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of approximately 772 linear feet of a 36-inch water main, starting downstream of the existing Eastern Regional Water Facility flowmeter, west side of the Econlockhatchee Trail side, going east crossing Econlockhatchee Trail and turn north throughout the Utilities Administration Building parking lot, to connect to the existing 36-inch water main at the northeastern side of the intersection with Curry Ford Road. In addition, the project includes expansion of the west side of the Utilities Administration Building parking lot plus milling and resurfacing of the entire existing parking lot. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |