Similar Projects
Hiawassee Road Force Main Replacement at SR 408
Infrastructure
Bidding
$1,342,842 est. value
Orlando, FL 32835

UCF Campus Infrastructure and Utility Production Facility - Industrial Mechanical and Wet-Utility Piping Work
Term Contract
Results
Orlando, FL 32826

Residential and Commercial Backflow Testing and Repairs
Term Contract
Results
Orlando, FL 32801

Small Meter Installation
Results
Orlando, FL

Potable Water Distribution Pipeline Replacement
Results
Orlando, FL 32831

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

The Hammocks Reclaimed Water Retrofit
Results
Ocoee, FL 34761

Water Meter and Backflow Installation and Exchange Services
Results
Orlando, FL

West Ponkan Road Construction of a Potable/Drinking Water Main (Ponkan Pines Road - Golden Gem Road)
Results
Apopka, FL 32712

Meter Boxes
Term Contract
Results
Orlando, FL 32801

Infrastructure Locator Contractor
Term Contract
Results
Orlando, FL 32801

Master Agreement for Water Distribution Construction Services, Lake Nona Boulevard Water Main Extension, Water Main Extension Boggy Creek North Phase 2A, and Neighborhood R and R Program Project Waterfront Estates Subdivision
Results
Orlando, FL 32824

South Water Reclamation Facility Flow Meter Improvements
Results
Less than $2,186,000 est. value
Orlando, FL 32819

McCoy Road Facility Watermain Improvements Project
Results
Orlando, FL 32812

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Last Updated 07/05/2021 04:09 AM
Project Title

Econlockhatchee Trail Parallel Water Main

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,079,498
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 772 linear feet of a 36-inch water main, starting downstream of the existing Eastern Regional Water Facility flowmeter, west side of the Econlockhatchee Trail side, going east crossing Econlockhatchee Trail and turn north throughout the Utilities Administration Building parking lot, to connect to the existing 36-inch water main at the northeastern side of the intersection with Curry Ford Road. In addition, the project includes expansion of the west side of the Utilities Administration Building parking lot plus milling and resurfacing of the entire existing parking lot.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents