Project Title | Collection System Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Gloucester Township, NJ 08012 (Camden County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of interceptor and manhole replacements to the West Collingswood Interceptor, a manhole rehabilitation in the Berlin Interceptor, replacement of the sloped masonry roofs at the Gloucester City and Cooper River Pump Stations, and relocation of stockpiles of soil to the CCMUAaEUR(TM)s Winslow percolation ponds. The West Collingswood work includes construction of a pipe and manhole network to replace several damaged West Collingswood Interceptor gravity manholes, including two (2) new manholes, pipe replacement, and abandonment in place of the old pipes and manholes. The Berlin Interceptor work includes the rehabilitation of a Berlin Interceptor gravity manhole including cleaning and surface preparation, crack and spall repair, if and where directed, and installation of the cured-in-place manhole liner. The roof replacement work includes demolition and removal of the existing masonry roof and installation of a new seam metal roof. The soil relocation work includes loading and transporting two (2) stockpiles of soil, one located at the CCMUA Cross Keys Pump Station and the other at the CCMUA Winslow percolation ponds, and placing the soil within the existing percolation ponds. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, as indicated in the Bid Form. Bidders are required to comply with the requirements of P.L. 1975, c.127 (N.J.A.C. 17:27 and N.J.S.A. 10:5-31 et seq.), Affirmative Action. Bidders are required to comply with the requirements of P.L. 1999, c. 238 (N.J.S.A. 34:11-56.25 et seq,), New Jersey State Prevailing Wage Act, where applicable. Proposals are being solicited through a fair and open process in accordance with N.J.S.A 19:44A-2.02, et seq., and as such, contractors are exempt from the limitations on making political contributions under that law. Further, for that reason, as well as because of a language in the New JerseyaEUR(TM)s Annual Appropriations Act, refusal to disclose campaign contributions otherwise required by NJSA 19:44A-20.2 et seq. and 19:44A-20.25 et seq., will not adversely affect your consideration for award. In accordance with the provisions of N.J.S.A. 58:11B-26, N.J.A.C. 7:22-3.17(a)24 and 4.17(a)24, the contractor (subcontractor) shall comply with all of the provisions of N.J.A.C. 7:22-9 for the participation of small business enterprises owned and controlled by Socially and Economically Disadvantaged (SED) individuals. Bidders are advised the SED goal for this project is twelve percent (12%). Bidders also shall be required to comply with the provisions of the following additional State Laws and Regulations: 1. Local Public Contracts Law N.J.S.A. 40A:11-2 et. seq. as supplemented and amended. 2. P.L. 2017, c. 317, which establishing standardized changed conditions clauses for certain local public contracts and supplementing P.L. 1971, c. 198 (N.J.S.A. 40A: 11-1 et seq.). 3. Disclosure Notice (P.L. 1977, c33) N.J.S.A. 52:24.1). 4. Title VI of the Civil Rights Act of 1964, Employment on Public Works (N.J.S.A. 10:2-1). 5. New Jersey Law against Discrimination (N.J.S.A. 10:5-1 to 10:5-42). 6. Statement of Corporate Ownership (Stockholder Disclosure Certification) as required under N.J.S.A. 52:25-24.2 7. New Jersey Business Registration of Public Contractors (BRC) as required under N.J.S.A. 52:32-44 8. New Jersey Public Works Contractor Registration Act (N.J.S.A. 34:11-56.48 et. seq) 9. Foreign Corporation Law (N.J.S.A. 14A:13.3) 10. Use of Domestic Materials (N.J.S.A. 52:33-1 to 52:33-3) 11. Prompt Payment Law (N.J.S.A. 2A:30A-2 et seq.) 12. Procedures and Requirements of the Loan (N.J.A.C. 7:22-3.1, 4.1, and 5.1) 13. Environmental Assessment Requirements (N.J.A.C. 7:22-10.11) 14. Construction of Environmental Infrastructure Facilities (N.J.A.C. 7:14.2) In order to perform public work, the Successful Bidder and Subcontractors prior to contract award shall hold or obtain such licenses as required by State Statutes, and Federal and local Laws and Regulations The Commissioners of the CCMUA require the successful Bidder to prove the necessity of any change order(s). Therefore, please pre-examine everything before submitting your bid. Where the nature or amount of change orders cause suspicion that they are being submitted to purposely inflate your bid, the CCMUA will decline payment and refer the activity to the appropriate law enforcement authorities. The Commissioners will take the same approach to any other subsequent request for increases to the contract price. The Owner reserves the right to reject all of the Bids received, to re-advertise for Bids, to abandon the project, to waive any or all minor informalities in any Bid received and to accept any proposal all in accordance with applicable law.aEUR Bid security shall be furnished in accordance with the Instructions to Bidders The deadline for submitting questions is Monday, October 24 at 4:00 p.m. local time |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |