Similar Projects
Pettit Farm PUD
New Construction
Conception
Cartersville, GA

Watson Farms
New Construction
Conception
Loganville, GA 30052

2058 Old Flowery Branch Road
New Construction - 193,600 SF
Design
$10,000,000 CJ est. value
Buford, GA 30519

Russell Road Townhomes
New Construction - 29,700 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Lawrenceville, GA 30043

Fulton County Housing Rehabilitation Program
Renovation
Bidding
$40,000 CJ est. value
Atlanta, GA 30334

RFQ Contractor - CHIP Homeowner Housing Rehabilitation
Renovation
Bidding
$60,000 CJ est. value
Cochran, GA 31014

2019 CHIP Housing Rehabilitation Program
Post-Bid
Fort Valley, GA 31030

Weatherization Assistance
Renovation
Post-Bid
Statesboro, GA 30459

Rehabilitation of (2) Homes
Renovation
Results
Albany, GA 31701

Repair of Several Buildings Damaged by Tornado
New Construction
Results
Covington, GA 30014

Loring
New Construction - 684,537 SF
Construction
Cumming, GA 30040

Theta Xi Chapter House
Renovation, Addition - 26,798 SF
Construction
$4,400,000 est. value
Atlanta, GA 30313

Grayson New Hope Road @ Round Road
New Construction - 318,600 SF
Pending Verification
$10,000,000 CJ est. value
Grayson, GA 30017

Pirkle Road Townhomes
New Construction - 94,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Norcross, GA 30093

Horizon Pointe
New Construction
Conception
Lawrenceville, GA 30043

Last Updated 09/06/2022 08:03 PM
Project Title

Warner Robins Housing Authority, IQC, Task 24, 2019, 2020 and 2021 CFP

Physical Address View project details and contacts
City, State (County) Warner Robins, GA 31088   (Houston County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Per addendum 1 bid date extended to 9/8/22 no change in time. Pre bid meeting also extended to 8/31/22 changed time from 2pm to 11am no change in location of meeting. Still NOT a mandatory meeting. Location: Memorial Terrace, Warner Robins, GA (103 dwellings) Will receive bids for furnishing all labor, materials, equipment, and services required to construct WARNER ROBINS HOUSING AUTHORITY, IQC, TASK 24, 2019, 2020 & 2021 CFP, WARNER ROBINS, GEORGIA - 2148 consisting of various modifications at dwelling units. Proposed Contract Forms, Drawings and Specifications are on file at the office of the Architect, SRJ Architects Inc., 1108 Maryland Drive, Albany, Georgia 31707-3879, telephone (229) 436-9877. . If documents are not returned, the entire deposit will be forfeited. Prime Contractors may purchase additional sets and subcontractors and material suppliers may purchase sets of the documentsfor the cost ofreproduction which is $150.00 perset. Thisis not refundable. No partial sets will be issued. Shipping charges are in addition to deposit. Checks shall be made payable to the Warner Robins Housing Authority. Documents may also be obtained from the Architect electronically in a .pdf format, for which a deposit will not be required. No partialsets will be issued. Prime Contractors,subcontractors, and material suppliers who obtain documents in this manner are responsible for providing their full company name, mailing address, email address, phone number, and fax number to the Architect. Prime Contractors, subcontractors, and material suppliers who obtain documents in this manner are also fully responsible for verifying that they have received a complete set of the Contract Forms, Drawings and Specifications. A certified check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation, payable to the Housing Authority, or satisfactory bond executed by an acceptable surety on the Bid Bond form contained in the Specifications, or other form acceptable to HUD and the LHA, and in an amount equal to five percent (5%) of the bid shall be submitted with each bid. The successful bidder will be required to furnish and pay forsatisfactory Performance and Payment Bond(s) in the amount of 100% of the contract amount. Allsureties must be authorized to transact business in the State of Georgia and must be listed on the U.S. Treasury Department Circular No. 570 (most current list), published annually listing companies approved to act as surety on bonds securing government contracts, and said surety or sureties must be in accordance with maximum underwriting limits on each contract as specified in the above mentioned Circular No. 570. Before the opening of bids, bidders or their representatives may attend a Prebid Conference with representatives of the LHA and the Architect. The conference will serve to allow bidders to visit the site(s) and address questions to the LHA and Architect. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Specifications must be paid on this Project. The Housing Authority reserves the right to reject any or all bids and to waive any informalities in the bidding. No bids may be withdrawn for a period ofsixty (60) dayssubsequent to the opening of bids without the consent of the Housing Authority.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents