Similar Projects
Northwest Trail and 2021 Street Maintenance
Infrastructure
Bidding
$350,000 est. value
Kasson, MN

Main Street Reconstruction Project
Infrastructure
Bidding
Rogers, MN 55374

Plymouth Avenue North Reconstruction
Post-Bid
Minneapolis, MN 55400

Reconstruct North Broadway Avenue
Post-Bid
Rochester, MN 55901

In Chisago County on Th 8 A Deer Garden Lane Grading, Bituminous Mill and Overlay, Bituminous Paving and Lighting
Results
MN

In Scott County on T.H. 169 Approx. 2200' South Of 173Rd St. W. Grading, Building Removal and Drainage
Results
MN

Grading and Concrete Culverts
Infrastructure
Bidding
MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Creekside Hills Trail
Results
Less than $188,000 est. value
Plymouth, MN

2021 Bituminous Street Resurfacing Improvements - Phase 2
Infrastructure
Bidding
Saint Cloud, MN

Ingman Minimum Maintenance Road Repair
Post-Bid
$25,000 est. value
Hill City, MN

2021 Pavement Improvement
Results
Afton, MN

Glacier Way Improvement
Infrastructure
Bidding
$836,103 est. value
Lakeville, MN

Bituminous Reclamation, Aggregate Base Class 5, Bituminous
Post-Bid
MN 56444

2021 Jo Nunn Park Trail
Results
Champlin, MN 55316

Last Updated 07/07/2021 08:56 AM
Project Title

Buttonbox Road Upgrade

Physical Address View project details and contacts
City, State (County) Togo, MN   (Itasca County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The labor, equipment, materials, tools, transportation, and incidentals necessary to: load, haul, and spread an estimated 5,400 cubic yards (loose measure) of Class 5 aggregate material with a binder percentage greater than 5%. The gravel will have to be purchased and supplied by the contractor. After graveling and compaction, the entire 4.0 mile project length is to be graded.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents