Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Fruit Valley Modernization
New Construction, Alteration
Bidding
$3,000,000 est. value
Vancouver, WA 98687

SR 125, Oregon State Line to Military Rd Vic Paving, Ada & Sidewalks
Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Walla Walla, WA 99362

Garrison Middle School Sidewalk Improvement
Infrastructure
Post-Bid
Walla Walla, WA 99362

WDFW - Roses Lake Access Redevelopment Phase Two Rebid - Manson
Infrastructure
Post-Bid
$186,400 est. value
Manson, WA 98831

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

Stormwater Repairs Phase III Construction
Alteration
Design
$5,200,000 est. value
WA

Wilbur Sidewalk Boone to Mission
Infrastructure
Bidding
$650,000 est. value
Spokane Valley, WA

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Foothills Trail - East Puyallup Trail Head Expansion - 3240 - Pierce County
Infrastructure
Design
Tacoma, WA

HOH-Clearwater Mainline MP15 Road Repair
Infrastructure
Bidding
$364,000 est. value
Forks, WA

Stormwater Management Plan
Alteration
Post-Bid
WA

Last Updated 06/08/2022 12:06 AM
Project Title

Longview and Kinder Reconstruction

Physical Address View project details and contacts
City, State (County) Moses Lake, WA 98837   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,750,000 to $2,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the reconstruction of 3,500 LF of Kinder Road and Longview Street with a new 8-inch PVC water main, new water service connections, fire hydrants, remaining sewer services, storm drainage, curb, and sidewalk. The project will also include upgrading the adjoining streets in the Longview Tracts neighborhood with sidewalks and new water meter services.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents