Similar Projects
Last Updated | 06/19/2019 06:12 PM |
Project Title | HCH Level 3 IR Suite Remodel |
Physical Address | View project details and contacts |
City, State (County) | Salt Lake City, UT 84112 (Salt Lake County) |
Category(s) | Medical |
Sub-Category(s) | Hospital |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,120,000 |
Plans Available from | State Agency - 10/17/18 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Phase 1: Demo vacated XRay Suite to begin construction on new IR Room 2, control room extension and Recovery Bays 7 -10. Existing IR Suite will remain functional during this Phase. Phase 2: Shut down existing IR Suite - Complete IR 1 remodel to move wall and cabinetry as shown on the plans. Demolition of remaining recovery space can begin during this phase. Leave existing control room intact to support existing IR1 after room remodel. Complete demo/construction of Storage Room N3626. Phase 3: Reopen Existing IR1-Relocate existing storage function from Rm N3630 t o newly constructed Storage Rm N3626. Relocate Single Occupancy Office from Rm N3525 to Rm N3630. Relocate Double Occupancy Office from Rm N3640 to Rm N3525. Complete demolition of remaining project area. Complete construction of nurse station, recovery bays, alcove storage room, print area, IR2 and control room up to the existing back wall of control room for IR1. Phase 4: Support install of IR2 machine. Relocate existing IR1 equipment in Equipment Room N3770 to make room for new IR2 equipment. Run lines and install IR2 equipment in room down the corridor (through active units) to Equipment Rm 3202. Connect new pneumatic tube station to system. Demo/connect existing control room to rest of control room expansion to complete the project. | ||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |