Similar Projects
Parking, Driveway, Pedestrian, Storm, and Landscape Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Lincoln City, OR 97367

South West 209th Avenue Kinnaman Road to Alexander Street Precast Concrete Pipe and Structures
Alteration
Post-Bid
Hillsboro, OR 97129

Columbia Children's Arboretum Improvement Project
Alteration
Post-Bid
Portland, OR

Day Care Building - ADA Improvements
Renovation, Alteration
Results
$150,000 est. value
Lakeview, OR 97630

Concrete Installation Services
Alteration
Results
$150,000 est. value
Hillsboro, OR

Covered areas, Concrete Slabs, and Sidewalks
Infrastructure, Alteration
Post-Bid
$2,000,000 est. value
Brookings, OR 97415

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
Oregon City, OR 97045

Concrete Installation, Repair and Maintenance Services
Alteration
Post-Bid
Salem, OR

Precast Concrete Storm Pipe and Structures for SW 209Th Ave
Alteration
Results
Hillsboro, OR

MPCO(Multi-layer Polymer Concrete Overlay) Epoxy for Salem Bridge Crew
Alteration
Post-Bid
Salem, OR

Bateman Creek Fish Passage and Habitat Enhancement
Infrastructure, Alteration
Results
$408,000 est. value
Gales Creek, OR 97117

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Office Remodel - Oregon Department of Transportation District 11 Office
Build-out
Post-Bid
$350,000 CJ est. value
Klamath Falls, OR 97603

Concrete Pad replacement and Concrete Sidewalk and Pad
Infrastructure, Alteration
Results
$300,000 est. value
Culver, OR

Last Updated 11/11/2022 08:39 AM
Project Title

Umatilla River - Mac Hoke Road (Bridge No. 24178)

Physical Address View project details and contacts
City, State (County) Echo, OR 97826   (Umatilla County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,127,404 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of installing an agency purchased prefabricated modular steel truss 147-foot single-span bridge over the Umatilla River, along with bridge approach road improvements, together with all other Work required to complete the Project as shown on the Drawings and specified herein. The prefabricated steel bridge will be available for delivery to the site in December 2022. Removal of Structures and Obstructions Earthwork Bridge Removal Work Structure Excavation Granular Wall Backfill Furnish Drilling Equipment Drilled Pile, 14-In. Diam. Substructure Structural Steel Prefabricated Steel Bridge Install Aggregate Base Level 2, 1/2-In. ACP Mixture Concrete Curbs, Standard Curb Guardrail, Type 4 Guardrail Transition, Guardrail Transition, Guardrail Anchors, Type 1 Modified Guardrail End Pieces, Type B

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents