Similar Projects
Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

Amherst Central Park - YR-1B - Town of Amherst
New Construction
Conception
$400,000 est. value
Buffalo, NY 14221

Walden Avenue Grocery Store
Addition, Renovation, Infrastructure
Design
$1,500,000 CJ est. value
Buffalo, NY 14211

Rogers Road Apartments
New Construction, Infrastructure
Design
$16,000,000 CJ est. value
Hamburg, NY 14075

Sturgeon Point Water Treatment Plant Washwater Tank Replacement
Infrastructure
Bidding
$700,000 CJ est. value
Derby, NY 14047

West Parking Garage
New Construction, Infrastructure - 28,830 SF
Post-Bid
$30,000,000 CJ est. value
Buffalo, NY 14203

Addition to Franco's Pizza
Addition, Demolition, Infrastructure - 554 SF
Post-Bid
$170,000 CJ est. value
Buffalo, NY 14217

CDBG Projects - North Central Waterline Replacement and Eaton Park Improvements
Renovation
Results
NY

Basketball Court Renovations - Clearfield Recreation Center and Briarhurst Park
Renovation
Results
Buffalo, NY 14221

D`Youville Container Park
New Construction - 4,000 SF
Construction
Buffalo, NY 14201

Apartments at the Lyceum
New Construction, Infrastructure
Construction
$23,000,000 CJ est. value
Buffalo, NY 14212

Covenant Gardens
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Hamburg, NY 14075

RFP - North Aud Block Redevelopment
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Buffalo, NY 14202

Dingens Warehouse
New Construction, Infrastructure - 150,000 SF
Conception
$15,000,000 CJ est. value
Buffalo, NY 14206

Elmwood Crossing Phase 2
New Construction, Renovation, Infrastructure - 10,123 SF
Design
$10,000,000 CJ est. value
Buffalo, NY 14222

Last Updated 01/03/2023 01:05 PM
Project Title

YPR Enhancement Project - Brighton Complex (Pool Demolition and Arena Structure)

Physical Address View project details and contacts
City, State (County) Tonawanda, NY 14150   (Erie County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Park/Playground, Site Development, Stadium, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $4,704,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

YPR Enhancement Project - Brighton Complex (Pool Demolition and Arena Structure) Demoltion of Brighton Pool and associated structures. Construction of arena structure

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Playground Equipment, Play Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents