Similar Projects
East Water Purification Plant Chlorine System Improvements - Package 2
Renovation
Bidding
$24,810,000 est. value
Houston, TX 77015

Water Plant Number 6
New Construction
Bidding
TX

Construction of Water Plant No. 1 MCC Replacement and SCADA System
New Construction
Post-Bid
Houston, TX 77014

Water Plant Improvements 2021
Renovation
Post-Bid
$150,000 est. value
Houston, TX 77090

Manvel Town Center Water Plant
Results
Houston, TX

Water Plant No. 1 & No. 2 Ion Exchange Conversion Pilot Study
Results
TX

2021 Water Plant No 2 Improvements
Renovation
Bidding
TX

Water Plant No. 1 Rehabilitation
Results
TX

Water Plant No. 2
Results
Houston, TX 77002

Water Plant No. 1 and No. 2 Improvements
Results
TX

Construction of Sanitary Sewer Rehabilitation Eagle Springs Water Plant PLC Addition
Addition
Results
TX

EWPP - Replacement Of Scrubbers
Results
Less than $3,368,680 est. value
Houston, TX

Construction of Water Plant No. 1 Rebuild and Water Plant No. 3 Expansion
Results
$5,450,000 est. value
Houston, TX 77084

Construction of Remote Water Well and Water Plant No. 2 Expansion
Results
$2,991,000 est. value
Humble, TX 77396

Repair and Repainting of the Ground Storage Tank at Water Plant No. 2
Results
Less than $350,000 est. value
Bunker Hill Village, TX

Last Updated 01/17/2022 04:19 AM
Project Title

RWTF WAS Pumps

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of digest WAS feed pumps and replacement of digester airlift.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents