Similar Projects
Hathaway Park Ramp and Boarding Pier Repairs
Infrastructure
Bidding
Punta Gorda, FL 33982

Red Bug Slough Preserve - Playground, Parking Lot and Accessibility Improvements
New Construction, Infrastructure
Bidding
$610,085 est. value
Sarasota, FL 34231

Design Build Step 1-Immokalee Area Improvements - Tiger Grant
Post-Bid
$16,400,000 est. value
Immokalee, FL 34142

Asphalt Sidewalk and Driveway
Post-Bid
West Palm Beach, FL

Easterly Wetlands Boardwalk
Results
$1,000,000 est. value
Orlando, FL 32802

Front Street Complete Streets Project
Results
Melbourne, FL 32901

Concrete Sidewalks Construction - Annual Bid
Term Contract
Bidding
Fort Walton Beach, FL 32548

Gateway Boulevard and Military Trail Intersection Improvements
Post-Bid
$1,360,000 est. value
West Palm Beach, FL 33472

Derbyshire Neighborhood Sidewalks Phase 1 - Third Street and Vine Street
Results
$589,000 to $763,000 est. value
Daytona Beach, FL 32100

Flagler Pedestrian Improvements
Infrastructure
Bidding
Key West, FL

Pavement, Sidewalk, Curb and Gutter Repair Services
Post-Bid
Kissimmee, FL

Fernwood Road (Village Green) Parking Improvements
Results
Key Biscayne, FL 33149

Sidewalk/Retaining Wall/Drainage Improvements (BDI)
Infrastructure
Bidding
$1,483,041 est. value
FL

Parking Lot at Park Place
Infrastructure
Post-Bid
Oakland Park, FL 33334

Surface Lot and Seawall at Biscayne Beach
Term Contract
Results
Less than $900,000 est. value
Miami Beach, FL 33141

Last Updated 03/15/2022 10:02 AM
Project Title

Resurface Fellsmere Grade Recreational Area Parking Lot

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32909   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To resurface the existing parking lot and adjoining access points. Limits of work are defined by speed hump south S-96 structure and speed hump at the end of Fellsmere Grade. The parking lot is approximately 135-feet by 545-feet wide (see attached site map)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents