Similar Projects
Reconstruction of sidewalks and curbs - 390258 - City of Kansas City
Infrastructure
Conception
$580,000 CJ est. value
Kansas City, MO 64113

Cambridge Crest
New Construction
Conception
$100,000,000 est. value
Kansas City, MO 64106

Cargo Largo Retail Stores
New Construction - 531,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Independence, MO

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

8th Street and Woodland Ave Streetscape - Rebid
Infrastructure
Bidding
$87,597 CJ est. value
Kansas City, MO 64106

Paradise Park Early Education Center Remodel and Site Programs
Build-out, Infrastructure
Bidding
$350,000 CJ est. value
Lees Summit, MO 64086

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Demolition of 1308 West Main Street
Infrastructure
Post-Bid
Blue Springs, MO 64015

2021 Shalimar Park Field Grading
Infrastructure
Results
Grandview, MO 64030

Metal Storage Building Kit at Pink Hill Park
New Construction - 72,000 SF
Results
Blue Springs, MO 64015

Foley Equipment Expansion
New Construction, Addition - 18,410 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Kansas City, MO

I-49 Industrial Center Building
New Construction - 921,000 SF
Pending Verification
$10,000,000 CJ est. value
Kansas City, MO 64121

Site Development - East Side Terminal Area - 47732185 - City Of Lee Summit
New Construction, Infrastructure
Conception
$2,653,000 CJ est. value
Lees Summit, MO 64064

Flynn Midwest Storage Building
New Construction - 11,250 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Kansas City, MO 64129

Northeast 51st Street (North Sale) Sidewalks - Gracemore Elementary Phase II
Infrastructure
Bidding
$572,227 CJ est. value
Kansas City, MO 64106

Last Updated 08/18/2022 04:09 PM
Project Title

James A Reed Road Self-Storage

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64133   (Jackson County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 15, 2022, this project is under review with the city. An architect has been selected; however information regarding the general contractor has not been disclosed. A firm construction timeline has not been established.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents