Similar Projects
West Henderson Parks And Recreation, Phases 2 - 5 - PR247 - City Of Henderson
New Construction, Infrastructure
Conception
$84,000,000 CJ est. value
Henderson, NV 89015

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

Ashley Furniture Industrial Facility
New Construction, Infrastructure - 298,389 SF
Design
$32,000,000 CJ est. value
Las Vegas, NV 89148

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Primrose School @ Centennial & Aliante
New Construction, Infrastructure - 13,545 SF
Bidding
$3,000,000 CJ est. value
North Las Vegas, NV 89031

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

Silverado Ranch Boulevard - Jones Boulevard To Arville Street - Phase A
Results
$7,851,626 to $8,678,112 est. value
NV

Sierra Vista Improvements
Infrastructure
Results
$3,151,446 to $3,483,178 est. value
Las Vegas, NV

Touro University Parking Expansion Phase II
New Construction
Construction
Henderson, NV 89014

Inspirada Marketplace
New Construction - 39,460 SF
Construction
$10,000,000 est. value
Henderson, NV 89009

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$9,600,000 CJ est. value
Henderson, NV 89015

Dream Hotel Las Vegas
New Construction, Infrastructure - 27,000 SF
Pending Verification
$545,000,000 CJ est. value
Las Vegas, NV 89119

Karen, Eastern to Mojave
Alteration
Conception
Less than $4,500,000 est. value
Las Vegas, NV 89135

Last Updated 12/21/2022 03:05 AM
Project Title

Harmon Avenue, Pecos Road to Boulder Highway

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89101   (Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $14,500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of Aug 18 the project has not yet been awarded. A timeline for award has not yet been established . A requirement of the contract includes a certification that Bidder is not currently engaged in, and agrees for the duration of the contract not to engage in, a boycott of Israel The project is located in Clark County, Nevada, T21S R62E Sections 19, 20 & 21 along Harmon Avenue from Pecos Road to Boulder Highway. The scope of work includes: reconstruction/rehabilitation of pavement and pavement widening improvements to intersecting streets and horizontal and vertical transitions install new concrete valley gutters, replace existing concrete valley gutters, and replace existing concrete valley gutters with asphalt pavement. replace substandard ADA facilities: sidewalk, ramps, traffic signal push buttons, and pedestrian facilities install or repair damaged curb, gutter, and sidewalk areas provide bicycle lanes and pavement markings Question Cutoff Date: 7/13/2022 08:00 PM (ET) storm drain facilities utility modifications and relocations street lighting modifications with LED upgrades and new lighting ITS conduit and fiber with pull boxes and other appurtenances upgrade traffic signals at intersections and install new loop detectors upgrade/replace all signage The scope of work includes: reconstruction/rehabilitation of pavement and pavement widening; improvements to intersecting streets and horizontal and vertical transitions; install new concrete valley gutters, replace existing concrete valley gutters, and replace existing concrete valley gutters with asphalt pavement; replace substandard ADA facilities: sidewalk, ramps, traffic signal push buttons, and pedestrian facilities; install or repair damaged curb, gutter, and sidewalk areas; provide bicycle lanes and pavement markings; storm drain facilities; utility modifications and relocations; street lighting modifications with LED upgrades and new lighting; ITS conduit and fiber with pull boxes and other appurtenances; upgrade traffic signals at intersections and install new loop detectors; upgrade/replace all signing. Labor and Material Payment Bond in the amount of 100% of the Contract price. 2. Performance Bond in the amount of 100% of the Contract price. 3. Guaranty Bond in the amount of 100% of the Contract price.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents