Last Updated | 12/21/2022 03:05 AM |
Project Title | Harmon Avenue, Pecos Road to Boulder Highway |
Physical Address | View project details and contacts |
City, State (County) | Las Vegas, NV 89101 (Clark County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $14,500,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of Aug 18 the project has not yet been awarded. A timeline for award has not yet been established . A requirement of the contract includes a certification that Bidder is not currently engaged in, and agrees for the duration of the contract not to engage in, a boycott of Israel The project is located in Clark County, Nevada, T21S R62E Sections 19, 20 & 21 along Harmon Avenue from Pecos Road to Boulder Highway. The scope of work includes: reconstruction/rehabilitation of pavement and pavement widening improvements to intersecting streets and horizontal and vertical transitions install new concrete valley gutters, replace existing concrete valley gutters, and replace existing concrete valley gutters with asphalt pavement. replace substandard ADA facilities: sidewalk, ramps, traffic signal push buttons, and pedestrian facilities install or repair damaged curb, gutter, and sidewalk areas provide bicycle lanes and pavement markings Question Cutoff Date: 7/13/2022 08:00 PM (ET) storm drain facilities utility modifications and relocations street lighting modifications with LED upgrades and new lighting ITS conduit and fiber with pull boxes and other appurtenances upgrade traffic signals at intersections and install new loop detectors upgrade/replace all signage The scope of work includes: reconstruction/rehabilitation of pavement and pavement widening; improvements to intersecting streets and horizontal and vertical transitions; install new concrete valley gutters, replace existing concrete valley gutters, and replace existing concrete valley gutters with asphalt pavement; replace substandard ADA facilities: sidewalk, ramps, traffic signal push buttons, and pedestrian facilities; install or repair damaged curb, gutter, and sidewalk areas; provide bicycle lanes and pavement markings; storm drain facilities; utility modifications and relocations; street lighting modifications with LED upgrades and new lighting; ITS conduit and fiber with pull boxes and other appurtenances; upgrade traffic signals at intersections and install new loop detectors; upgrade/replace all signing. Labor and Material Payment Bond in the amount of 100% of the Contract price. 2. Performance Bond in the amount of 100% of the Contract price. 3. Guaranty Bond in the amount of 100% of the Contract price. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |