Similar Projects
Caverna Independent Schools Secure Entrance Improvements
Alteration
Bidding
Less than $200,000 est. value
Cave City, KY 42127

Town Branch Scum Facility Improvements
Renovation, Alteration
Bidding
Lexington, KY 40504

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

Generator Preventative Maintenance and Inspections
Results
Florence, KY 41042

KCIW Lonnie Watson Emergency Generator
Results
Less than $262,327 est. value
Pewee Valley, KY 40056

Diesel Generator and ATS for the JFK Community Center
Post-Bid
Henderson, KY

Emergency Generator Replacement Phase II
Results
$66,500 est. value
Hopkinsville, KY 42240

Uninterruptible Power Supplies (UPS)
Post-Bid
KY

Emergency Generator Phase I
Results
$70,000 est. value
Ashland, KY 41102

Electrical Modifications
Post-Bid
Middlesborough, KY

Canopy Lights
Alteration
Results
Hebron, KY 41048

Downtown Street Light Equipment
Alteration
Post-Bid
Lexington, KY

Construct Shipping Containers for Offices & Storage Building
New Construction
Results
Louisville, KY 40218

Electric Power Transmission and Distribution Franchise
Alteration
Post-Bid
Ashland, KY

Last Updated 09/22/2021 06:00 PM
Project Title

New High-Voltage Electrical Duct Bank Across South Upper Street

Physical Address View project details and contacts
City, State (County) Lexington, KY 40502   (Fayette County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $243,726
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UK High Voltage Utilities requires installation of a new electrical duct bank across S. Upper Street to replace an outdated duct bank containing Orangeburg conduits (and the aging circuits within). This project will allow full use of the new duct bank across S. Limestone, improve safety conditions in vaults 104 and 105, and improve general reliability for nearly all circuits coming to campus from substation #2 (especially circuit 2-5 which experienced a recent outage and feeds much of the Ave. of Champions corridor, as well as serving as a backup to the Peterson Service building, Heating #2, Parking #5, and the new Cornerstone facility). No electrical outages should be required. Sidewalk and single-lane road closures will be required.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents