Similar Projects
Upgrade Building 504 Fire Detection and Install Fire Suppression
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Camp Douglas, WI

Sprinkler Head Replacements-CHCC
Alteration
Post-Bid
Wyocena, WI 53969

Vendor Contract for Smoke Alarms
Alteration
Post-Bid
Milwaukee, WI

Brookside Care Center Fire Protection Piping Replacement
Alteration
Results
Kenosha, WI 53144

Install Fire Suppression System -GPC
Alteration
Results
$2,440,000 est. value
Madison, WI 53704

Fire Alarm Upgrade - Milwaukee Secure Detention Facility
Renovation
Construction
$232,500 CJ est. value
Milwaukee, WI 53233

Testing of Fire Alarm System
Term Contract, Alteration
Post-Bid
Madison, WI 53705

Multi-Building Fire Alarm Replacement and Renovation, Phase 8
Alteration
Results
$4,455,000 est. value
Madison, WI 53715

Fire Alarm System and Component Testing and Inspection Services
Alteration
Post-Bid
Milwaukee, WI

Dodge County Detention Facility Sprinkler Head Replacement
Alteration
Results
Juneau, WI 53039

Fire Sprinkler System Inspections & Repairs
Term Contract
Post-Bid
WI

Engineering Hall Sprinkler and Gas Piping-Phase 1 - GPC
Infrastructure, Alteration
Results
$3,500,000 est. value
Madison, WI 53706

M Series Hydrant Upper And Lower Valve Plates
Alteration
Post-Bid
Milwaukee, WI

Engineering Hall Sprinkler and Gas Piping-Phase 1 - MEP
Infrastructure, Alteration
Results
$3,500,000 est. value
Madison, WI 53706

Various Work Items for Phase 4A Townhomes (Westlawn Renaissance VII) at Westlawn Gardens Phase 2
Alteration
Post-Bid
Milwaukee, WI

Last Updated 03/15/2023 09:41 AM
Project Title

Fire Alarm Replacement

Physical Address View project details and contacts
City, State (County) Madison, WI 53715   (Dane County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $154,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project. All potential bidders must become certified by DOA prior to submitting bids on state construction projects . All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website. DFD Contractor Certification page: In general the work consists of: A complete replacement of the building fire alarm system in the Ag Engineering Lab. The new fire alarm panel will be connected to the central campus reporting system to report to the UW Police Department. The existing system components shall be turned over to the Owner. Contract offer and construction phase records will be processed electronically on the WisBuild(TM) DFD Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents