Similar Projects
Greenways And Trails - City Of Greenville
Alteration
Conception
$1,000,000 est. value
Greenville, SC 29601

Sewer Projects: Don Avenue/Curtis Street - City of Anderson
Infrastructure
Conception
$500,000 CJ est. value
Anderson, SC 29624

Spencer's Trail
New Construction
Design
Anderson, SC

Infrastructure Water Line Removal - West Market Street Roundabout - City of Anderson
Infrastructure
Design
$310,000 CJ est. value
Anderson, SC 29624

Reconstruction - Rehabilitation - District 2
Post-Bid

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Paving Centerville Elem Driveway
Infrastructure
Results
SC

Repave Bus Loop Rams
Infrastructure
Results
Anderson, SC

Techtronic Industries Manufacturing Plant and Warehouse
Addition, Demolition, Infrastructure - 1,000,000 SF
Pending Verification
$75,000,000 CJ est. value
Anderson, SC 29621

Tiger Cove RV Park
New Construction, Infrastructure - 3,000 SF
Pending Verification
$6,000,000 CJ est. value
Anderson, SC 29626

Generostee Relief Sewer - City of Anderson
Infrastructure
Conception
$19,300,000 CJ est. value
Anderson, SC 29624

Linley Park South - Construction of 9 Mile Link - City of Anderson
Infrastructure
Design
$2,500,000 CJ est. value
Anderson, SC 29625

Construction of North Main Street Streetscape and Plaza Development
Infrastructure
Post-Bid
Anderson, SC 29621

Driveway Crack Fill At Mclees Elementary
Alteration
Results
Anderson, SC

Anderson County Energy Center
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Anderson, SC 29621

Last Updated 11/18/2022 11:26 AM
Project Title

West Queen Street Streetscape

Physical Address View project details and contacts
City, State (County) Pendleton, SC 29670   (Anderson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of improvements to the pedestrian access, parking, and community connection along W. Queen St from Mechanic St to the Pendleton Community Center. The construction and modifications consist of the following: a. Clearing and grubbing, civil/site work, etc. b. Installation of new influent lift station and influent gravity line modifications. c. Grating and handrail replacement for primary lagoon effluent structure. d. Electric actuator replacement for effluent control valve. e. Construction of new chlorine contact basin and installation of chlorination/dechlorination equipment. f. Installation of new creek flow measuring instrument. g. Installation of rip rap at outfall structure. h. New automatic transfer switch for existing emergency generator. i. Miscellaneous valving and piping. j. Electrical work and controls. All questions must be submitted by 5:00 p.m. local time on Thursday November 10th, 2022 via email to tyler.morgan@gmcnetwork.com. The Project consists of the improvements to the pedestrian access, parking, and community connection along West Queen Street from Mechanic Street to the Pendleton Community Center Bidders must also make positive efforts to use small and minority-owned business and to offer employment, training and contracting opportunities in accordance with Section 3 of the Housing and Urban Development Act of 1968. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract. All bidders are advised that the application with cost estimate is available for review. The owner reserves the right to waive any irregularities, or to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM). Bidders on this work will be required to comply with the President's Executive Order No. 11246 & Order No. 11375 which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must comply with Title VI if the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act, the Contract Work Hours and Safety Standards Act, and 40 CFR 33.240. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents