Similar Projects
Milledgeville Streetscape - Phase IV
Results
Milledgeville, GA

Gwinnett Street Widening
Results
Savannah, GA

Phase I Entrance Road
Results
Savannah, GA 31400

Jekyll Island Road Resurfacing
Results
Jekyll Island, GA 31527

Southern Region Disaster Recovery Support BPA
Results

Last Updated 05/15/2020 01:22 PM
Project Title

Road Paving and Asphalt Overlay

Physical Address View project details and contacts
City, State (County) Sylvester, GA 31791   (Worth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,968,179
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately total of 26.54 miles of road paving and asphalt overlay on roads located within the County. Work performed will include resurfacing with the specified surface or constructed with the appropriate surface treatment as noted. Asphalt resurfacing of existing roadway section shall consist of Soil Cement Base, Asphaltic Concrete Leveling Course, Bituminous tack coat as well as all required Leveling, Striping, Crack Sealant, Shoulder Clipping, and miscellaneous work required. Surface treatment roads shall be constructed as per County specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents