Similar Projects
Wisconsin 175 Improvements - Wisconsin Department of Transportation
Infrastructure
Conception
$6,686,850 CJ est. value
Milwaukee, WI 53224

Wisconsin 175 Improvements - Wisconsin Department of Transportation
Infrastructure
Conception
$6,686,850 CJ est. value
Milwaukee, WI 53224

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$148,000,000 CJ est. value
Milwaukee, WI 53202

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$148,000,000 CJ est. value
Milwaukee, WI 53202

Avenir Apartment Homes Phases II & III
New Construction - 96,557 SF
Post-Bid
$26,000,000 est. value
Milwaukee, WI 53202

Fox Crossing Cold Spring Road Reconstruction
Infrastructure
Post-Bid
$470,000 CJ est. value
Greenfield, WI 53228

South Hickory Street Pavement Improvements
Infrastructure
Results
$3,215,000 est. value
South Milwaukee, WI 53172

Madison and 57th Street
Infrastructure
Results
$1,694,659 est. value
West Allis, WI

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Redevelopment Opportunity - 1214 Milwaukee Avenue - City of South Milwaukee
New Construction, Infrastructure
Conception
$3,474,055 CJ est. value
South Milwaukee, WI 53172

South 13th Street Industrial Building
New Construction, Infrastructure - 191,406 SF
Design
$103,000,000 CJ est. value
Oak Creek, WI 53154

Energy Rater Services for Building 3.4 (Westlawn Renaissance VII) at Westlawn Gardens Phase 2
Term Contract
Post-Bid
Milwaukee, WI 53218

Last Updated 10/16/2023 04:08 PM
Project Title

Avenir Apartments - Phase 2 & 3

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53202   (Milwaukee County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $55,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of two buildings with underground parking garage and associated site work. As of October 16, 2023, this project has been placed on indefinite hold, and it is not yet clear when it will proceed. A construction timeline has not yet been established.

Details

5 Stories Above Grade, New Construction, New Construction. 1 Story Below Grade, New Construction, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents