Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Galvanized Pipe Replacement Program College St. Area
Infrastructure
Bidding
Jacksonville, FL

Utility Locate Services
Infrastructure
Bidding
Clearwater, FL

Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

On-Call Plumbing/Sewer and Drain Services
Results
Tallahassee, FL 32312

Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Cured-In-Place Pipe (CIPP Lining)
Results
Hollywood, FL 33022

RIVERTOWN MAIN STREET Phase 3
New Construction
Construction
Jacksonville, FL

Lemon-Gray Trunk Sewer Rehabilitation by C.I.P.P. Lining
Infrastructure
Bidding
Tampa, FL

Pipeline Pig Service
Post-Bid
Less than $210,000 est. value
Tampa, FL 33601

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Force Main Installation Project (S. Alhambra Circle)
Infrastructure
Bidding
Coral Gables, FL 33146

Pipeline Wet Tapping and Line Stop Continuing Construction Contract
Term Contract
Post-Bid
$5,500,000 est. value
West Palm Beach, FL 33416

Utility Locating Services Annual Contract
Term Contract
Results
New Smyrna Beach, FL

LS 1P W Industrial Lane Gravity Sewer Rehabilitation
Infrastructure
Bidding
Orlando, FL

Last Updated 06/28/2021 03:44 AM
Project Title

Sewer Screening System for Detention Center

Physical Address View project details and contacts
City, State (County) Palmetto, FL 34205   (Manatee County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing the existing sewer screening system at Manatee County's Detention Center. The existing structure will be retrofitted to replace the existing 12.75 inch bar screen with a new 18 inch screening system including new screening structural and electrical componets. Install a new above ground Magmeter. Clean and inspect existing wetwell fiberglass liner, and repair as needed. Clean, prepare, and make any needed repairs to concrete structure before application of new liner. Inspect discharge piping, guide rails, pipe bracing, base ells, influent force main brackets, and / or mounting plates for corrosion damage, and remove and replace as necessary.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents