Similar Projects
Stephen F. Austin Elementary Playground Improvements
Infrastructure
Design
$400,000 CJ est. value
Gregory, TX 78359

Freddy's - Nacogdoches / Freddy's Frozen Custard & Steakburgers
New Construction, Infrastructure - 3,112 SF
Design
$2,000,000 CJ est. value
Nacogdoches, TX 75965

NISD McMichael Restroom Addition
Addition, Demolition, Infrastructure
Bidding
$200,000 CJ est. value
Nacogdoches, TX 75961

NISD McMichael Restroom Addition
Addition, Demolition, Infrastructure
Bidding
$200,000 CJ est. value
Nacogdoches, TX 75961

Construction of a Weight Room Addition
Addition
Post-Bid
Garrison, TX

Jack C. Hays HS - Bleachers
Renovation
Post-Bid

CMAR High School, Multi-Pupose Facility, and Possible Various Projects
Results
Garrison, TX

NISD Mike Moses Renovation
Renovation
Results
$1,775,000 est. value
Nacogdoches, TX 75961

Middle School and Other Campus Improvements
Renovation
Construction
Less than $7,500,000 est. value
TX 75978

Douglass Independent School District Softball Field Relocation (Pkg A)
New Construction, Infrastructure
Construction
$400,000 CJ est. value
Douglass, TX 75943

Agriculture and Technology Complex - Stephen F. Austin State University
New Construction, Infrastructure - 54,000 SF
Pending Verification
$45,000,000 CJ est. value
Nacogdoches, TX 75965

City Park Restroom
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Nacogdoches, TX 75961

CMAR for the Completion of A Miscellaneous Building Additions and Renovations
Renovation, Addition
Post-Bid
Nacogdoches, TX

Fredonia Pre-K Renovation
Renovation
Results
Nacogdoches, TX 75964

New High School
New Construction
Post-Bid
Garrison, TX

Last Updated 09/12/2022 09:22 AM
Project Title

Woden Independent School District New Administration Building

Physical Address View project details and contacts
City, State (County) Nacogdoches, TX 75961   (Nacogdoches County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Office, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope consists of but is not limited to site work and new construction of the administrative building for Woden Independent School District. As of August 11, 2022, subcontract bids have been let. Awards of trades have not been announced. Construction is anticipated to begin third quarter 2022.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents