Similar Projects
Makers Quarter Masterplan
New Construction
Conception
San Diego, CA 92101

Google Middlefield Park Master Plan
New Construction - 1,350,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Evergreen Valley College Student Services Complex
New Construction - 71,000 SF
Design
$54,700,000 est. value
San Jose, CA 95135

Berkeley Commons Offices and Laboratories
New Construction - 728,088 SF
Design
$10,000,000 CJ est. value
Berkeley, CA 94710

Mission Rock - Block G - 1st Building
New Construction
Construction
San Francisco, CA 94158

Arts District Office Building
New Construction - 113,000 SF
Construction
$10,000,000 CJ est. value
Los Angeles, CA 90021

Gateway of Pacific Phase 2 and 3
New Construction
Pending Verification
South San Francisco, CA 94080

Gateway of Pacific Phase 4 and 5
New Construction
Pending Verification
South San Francisco, CA 94080

Esri Campus Center
New Construction
Conception
Redlands, CA 92373

Flower Mart Mixed Use Development
New Construction - 2,100,000 SF
Design
$10,000,000 CJ est. value
San Francisco, CA 94107

Renaissance Marketplace
New Construction
Pending Verification
Rialto, CA 92376

Oyster Point Life Sciences Complex Phase 2-4
New Construction - 13,656,000 SF
Conception
$10,000,000 CJ est. value
South San Francisco, CA

Los Angeles Clippers Arena
New Construction
Design
Inglewood, CA 90304

10 South Van Ness Mixed Use Development
New Construction
Pending Verification
San Francisco, CA

Crossroads Hollywood Mixed Use Development
New Construction - 1,400,000 SF
Conception
$10,000,000 CJ est. value
Los Angeles, CA 90028

Reported 05/14/2021 06:57 PM
Project Title

Skechers Headquarters Expansion

Physical Address View project details and contacts
City, State (County) Manhattan Beach, CA 90266   (Los Angeles County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Office
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value $150,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

a 100,000-square-foot design center and office building with 609 basement parking stalls at 2901 Pacific Coast Highway in Hermosa Beach; a 37,000-square-foot office building with 199 basement parking spaces at 305 Sepulveda Boulevard in Manhattan Beach; and an expansion of an existing office building at 330 Sepulveda Boulevard which will add 20,000 square feet of floor area and basement parking for 127 vehicles

Details

Office, Addition, Manufacturing/Processing Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents