Similar Projects
2023 Bond - Decatur ISD
New Construction, Renovation, Infrastructure
Conception
$331,200,000 CJ est. value
Decatur, TX 76234

CEFCO
New Construction - 6,000 SF
Design
$800,000 est. value
Decatur, TX

Murphy #6528/7859 /Decatur
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$2,000,000 CJ est. value
Decatur, TX 76234

US0287 - Bridge Beam Repair
Infrastructure
Bidding
$128,540 CJ est. value
Alvord, TX 76225

US0287 - Bridge Beam Repair
Infrastructure
Bidding
$128,540 CJ est. value
Alvord, TX 76225

Dickey's Barbecue Pit
Build-Out - 2,000 SF
Post-Bid
$180,000 est. value
Decatur, TX

FM 3433 Turn Lane Improvements
Infrastructure
Post-Bid
Newark, TX 76071

Paving Improvements for Reunion, Phase 1
Infrastructure
Results
TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Braum's Ice Cream
Renovation - 6,453 SF
Construction
$350,000 est. value
Decatur, TX 76234

Allsup's
New Construction - 4,686 SF
Construction
$1,700,000 est. value
Decatur, TX 76234

2020 Bond - Bridgeport Independent School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$94,900,000 CJ est. value
Bridgeport, TX 76426

Cefco #0111 Decatur Texas
New Construction, Infrastructure - 6,000 SF
Pending Verification
$878,500 CJ est. value
Decatur, TX 76234

2022 Bond - Proposition A - Paradise Independent School District
New Construction, Renovation, Infrastructure - 80,000 SF
Design
$49,500,000 CJ est. value
Paradise, TX 76073

Prairie View Elementary West Bus Drive
Infrastructure
Post-Bid
Rhome, TX 76078

Last Updated 02/23/2023 11:34 AM
Project Title

QuikTrip #1873 / Rhome

Physical Address View project details and contacts
City, State (County) Rhome, TX 76078   (Wise County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status All Bids Received, Selection Underway, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 23, 2023, the owner has received bids from their invited general contractors. Attempts to obtain the awarded general contractor is underway. The permit has been approved but not yet issued. Award information has yet to be announced.

Details

1 Story Above Grade, 7,318 SF. 1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents