Similar Projects
DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

Arlington Court 2nd Floor Roof Repair
Alteration
Post-Bid
Milwaukee, WI 53202

2021 Time & Material Parks Facilities
Term Contract
Results
Milwaukee, WI

Riverside Campus Roof Recoating Area A
Results
Milwaukee, WI 53211

Interpretative Center Roof Replacement Havenwoods State Forest
Renovation
Construction
$328,400 CJ est. value
Milwaukee, WI 53209

Green Roof Maintenance for Convent Hill and Lapham Park
Alteration
Post-Bid
Milwaukee, WI 53212

13th Street Roof and HVAC Upgrades
Alteration
Results
Milwaukee, WI 53221

Green Roof Irrigation System Maintenance For Convent Hill & Lapham Park
Alteration
Post-Bid
Milwaukee, WI 53212

Buildings 306 and 307 Roof Replacements
Infrastructure
Results
Oak Creek, WI 53154

Aluminum Roof Coating for Various Sites, System Wide
Renovation
Post-Bid
$300,000 CJ est. value
Milwaukee, WI 53202

DPW Roof Replacement
Alteration
Results
West Allis, WI 53219

2022 City Hall / Library Roof Retrofit Project
Alteration
Post-Bid
$230,000 est. value
Oak Creek, WI 53154

DMC Main Building Roof Replacement Areas 5, 33A-B and 20
Alteration
Results
Milwaukee, WI 53233

Replace Roof
Renovation
Post-Bid
$40,000 CJ est. value
Milwaukee, WI 53214

Time and Material Behavioral Health Division - Roofing
Alteration
Results
Wauwatosa, WI 53226

Last Updated 12/26/2022 11:05 PM
Project Title

Replace Roof at 7209 - 7215 Oklahoma Avenue

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53202   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $35,850 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish labor, material and service necessary to remove/replace roof at 7209-7215 Oklahoma Avenue, Milwaukee, WI 53219, as per the following scope: Note: Contractors shall perform work in accordance with all lead and asbestos removing procedures including, but not limited to, the containment and removal of materials on the ground. Contractor shall provide a dumpster for the containment of debris at commencement of project. Bagging is not acceptable. Contractor will be responsible for any damages done to lawn, or to neighbor's property. Site should be cleaned up DAILY. Storage of materials on site is not allowed. Contractor is responsible for providing a power source. Overall job is to be professional and done in a workmanlike manner. You are strongly encouraged to attend a walk-through with the Manager and/or Maintenance to ensure the responsiveness of your bid and meet the scope of work. If you desire to visit the property, contact the Housing Manager, Kelly Duncan at 414-286-5797, or Kelly.Duncanahacm.orq to schedule an appointment. ROOF 1. Safeguard property from falling objects coming from the roof. 2. Remove existing shingles, drip edge, de-icing systems, vents and any damaged or rotted roof sheathing and/or deck board on house. 3. Re-sheet entire roof with 7116" OSB. 4. Dispose of any cable lines, antenna and satellite dishes, etc. 5. Install new gutter apron in guttered areas and new drip edge on eaves as applicable. Space Gutter apron to receive gutter behind the flashing, or install gutter when installing gutter apron flashing. 6. Install new 3' wide ice and water shield at base of roof covering gutter apron on roof. Install 18" wide

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents