Similar Projects
Last Updated | 12/07/2022 05:04 PM |
Project Title | RFQ D/B - Golf Course - Varsity Practice Greens |
Physical Address | View project details and contacts |
City, State (County) | Columbus, OH 43221 (Franklin County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Golf Course, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $856,749 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project scope shall consist of re-working the existing varsity golf short game practice area on The Ohio State University's Golf Course located in Upper Arlington Ohio. Scope will convert an existing (1) larger green/ practice area into 3 smaller greens complete with new sand and grass bunkers, turf and drainage systems. It is anticipated that Irrigation systems for the area will need to be reworked. In addition to the short game practice area, scope may include the addition of a putting green and re-work of adjoining tee boxes (these scopes being add alternates to the base scope practice area). In 2005 and 2006, The Ohio State University Golf Course underwent a major restoration that was overseen by Jack Nicklaus (Nicklaus Design, LLC). Nicklaus Design will be involved in the project and will be acting in a Criteria Architect role, setting the parameters for how the area will look, feel, and function. It is anticipated that the successful design build contractor shall retain engineers of record (Civil/ MEP / Irrigation) as well as golf course contractors/ turf installers (if they do not function as a golf course contractor/ installer as a primary means of business) underneath of their scope of services. Engineers will be responsible for charting and integrating concepts provided by Nicklaus Design into final construction documents and will be in charge of administering the project through the construction phase. All vendors housed within the design build contractor's scope will be subject to review by the University and authorized for work on the golf course based on applicable previous golf course experience. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner's policies and procedures DB Preconstruction Services Start 02 / 2023 Construction Stage Notice to Proceed 04 / 2023 Substantial Completion of all Work 12 / 2023 DB Services Completed 01 / 2024 Submit all questions regarding this RFQ in writing to Todd Henderly at henderly.8@osu.edu with the project number and name included in the subject line (no phone calls please) |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |