Similar Projects
Annual Contract - Asphalt, Paving and Pathway Construction
Term Contract
Bidding
FL

General Paving, Patching and Striping Services
Bidding
FL

Resurfacing City of Pahokee Roadways - Phase III
Post-Bid
Pahokee, FL 33476

Park Asphalt Overlay and New Parking at John Stretch Memorial Park, Haverhill Park and Glades Pioneer Park
Post-Bid
Haverhill, FL 33415

Palmetto Park Road from Southwest 7th Avenue to Southwest 5th Avenue
Results
Less than $4,950,000 est. value
FL

Loxahatchee River Road at the SFWMD C-18 Canal
Results
Less than $1,200,000 est. value
West Palm Beach, FL 33411

Bike Lane/Sidewalk/Milling and Resurfacing/Steel Sheet Piling/Traffic Signals
Bidding
$2,214,321 est. value
FL

Unit 11 PGA National - Ryder Cup Milling Resurfacing Project
Post-Bid
Palm Beach Gardens, FL

Melaleuca Lane and Jog Road Intersection Improvements
Results
West Palm Beach, FL 33411

Milling and Resurfacing/ Excavation/Embankment/Base Work
Bidding
$22,912,932 est. value
FL

Collector Roadway Lighting
Post-Bid
Less than $225,000 est. value
Jupiter, FL 33458

Garden Road from South of FDOT Canal to South of Blue Heron Boulevard
Results
Less than $1,000,000 est. value
West Palm Beach, FL 33411

Milling and Resurfacing NW 1st Avenue and NW 2nd Street
Bidding
South Bay, FL 33493

Roadside Assistance Services
Post-Bid

Miscellaneous Construction
Results
Less than $1,000,000 est. value
FL

Reported 05/19/2021 12:00 AM
Project Title

Unit 2C - Alton Road and Neighborhood 1 Final Paving Project

Physical Address View project details and contacts
City, State (County) Riviera Beach, FL 33418   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 05/19/21
Owner View project details and contacts
Architect View project details and contacts
Description

Milling and resurfacing of existing roadway in front of model homes and removal and replacement of damaged concrete alleys. Curb, sidewalk and roadway repair, paver crosswalk installation, final lift asphalt, signage repair and final pavement markings for Alton Road and Neighborhood 1, both located in the City of Palm Beach Gardens, Florida

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents