Similar Projects
ADA Curb Ramps and Sidewalk
Infrastructure
Bidding
SD

Urban Reconstruction (76K CuYd), PCC Surfacing (40K SqYd), Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Bidding
SD

City Parking Lots ADA Parking Spaces
Post-Bid
Rapid City, SD

Main Street Streetscape
Post-Bid
Vermillion, SD

I-29 Exit 73 Interchange Improvement
Results
Less than $800,000 est. value
Tea, SD 57064

2021 Douglas/Washington Streets
Results
Elk Point, SD 57025

The Crossroads Mixed Commercial Development
New Construction, Demolition, Infrastructure
Pending Verification
Sioux Falls, SD

Urban Reconstruction (8K CuYd), PCC Surfacing (7K SqYd), Lighting, Curb and Gutter, Storm Sewer
Infrastructure
Bidding
SD

Streeter Drive Realignment
Post-Bid
$1,281,000 est. value
North Sioux City, SD

Manderson Pathway
Results
$1,214,346 to $1,274,496 est. value
Pine Ridge, SD

Suspended Sidewalk
Infrastructure
Bidding
SD

2020 ADA Improvements
Post-Bid
Rapid City, SD

Kyle Pathway Oglala Sioux Tribe
New Construction
Results
SD 57756

Shared Use Path Construction , Lighting
Infrastructure
Bidding
SD

Avon Main Street Reconstruction
Post-Bid
Less than $1,500,000 est. value
Avon, SD

Last Updated 09/30/2021 12:07 PM
Project Title

Z--Replace Timber Curb & Sidewalk Park Lots

Physical Address View project details and contacts
City, State (County) Interior, SD   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work for this project consists of removing approximately 6,049 feet of deteriorated wood timber (6-inch x 6-inch) curbing, and approximately 4,259 feet of asphalt walkway in ten parking lot areas throughout the park. The project would also consist of installing approximately 6,049 feet of 6-inch concrete curbing, gutters, and 4259 feet by 6 feet wide concrete sidewalks. All sidewalks, curbs, and gutters will slope to the parking lots. All sidewalks and handicap walks and parking spaces shall meet ABA regulations. Cliff shelf trail has a bump out of asphalt currently being used for a walkway and will need replaced with concreate see picture below. When installing new curb/gutter a cut no more than 5 foot away from where curb/gutter are going to be installed should be made into the parking lot. The new curb/gutter shall tie into the new asphalt. The new asphalt will then tie into the existing asphalt in the parking lot. Not more than 2 sites will be closed off at one time. Contractor should not move to put a new site under construction until the work at one or both sites under construction is complete and ready for vehicle use.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents