Similar Projects
Contract No. 2 - KY 875 Gas Main Extension
Post-Bid
Brooksville, KY

Green River Lake Hydraulic Line Replacement
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Campbellsville, KY 42718

SDF Deicing and Fuel Storage Facility
Results
Louisville, KY

External Tank Inspection
Results
Richmond, KY 40475

On and Off Road Fuel
Term Contract, Alteration
Post-Bid
KY

Environmental Operations Tank Inspections And Repairs
Results
Erlanger, KY

Gas Line Replacement
Infrastructure
Post-Bid
Tompkinsville, KY 42167

West Hickman Wet Weather Storage Facility - Phase 2
Infrastructure
Results
Lexington, KY

Dissolved Sulfide Control Treatment
Infrastructure
Post-Bid
Hebron, KY 41048

WTP Ammonia Systems and Sulfuric Acid Upgrades
Infrastructure
Results
Frankfort, KY 40601

Modular Utility Vaults
Infrastructure
Post-Bid
Richmond, KY

Fuel Tanks For Generators
Alteration
Results
Nicholasville, KY 40356

Diesel Duel Fuel Forklift
Infrastructure
Post-Bid
Ashland, KY

Natural Gas Rehabilitation
Infrastructure
Results
Murray, KY

Fleet Management System
Infrastructure
Post-Bid
Nicholasville, KY

Reported 07/02/2022 12:00 AM
Project Title

Exposed Natural Gas Lines Replacement

Physical Address View project details and contacts
City, State (County) Clay, KY   (Webster County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of the following: 1. 360 linear feet of 6-inch dual coated steel, 0.219" wall thickness pipe utilizing horizontal directional drilling. 2. Depth at least 10 feet below depth of waterway (final depth determination by OWNER/CONTRACTOR). 3. Installation of hot tap at each end of new line with connection to existing line, eliminating exposed line. 4. Purging of new and retired pipeline. 5. Correction of disturbed ground with grass seed and straw to pre-excavated state. 6. The gas line must remain in service throughout remediation. 7. No work in, or alteration of, the waterway shall be permitted

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents