Similar Projects
Downtown Greenway Corridor Extension - City of Petoskey
Infrastructure
Conception
$250,000 CJ est. value
Petoskey, MI 49770

Chip and Fog Seal and Pavement Markings on Pleasantview Road
Infrastructure
Design
$232,000 CJ est. value
Pellston, MI 49769

Harbor Springs Public Schools
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Harbor Springs, MI 49740

E. Robinson Road
Infrastructure
Bidding
$200,000 CJ est. value
Pellston, MI 49769

LTBBOI Second Street Housing Bid Package #2
New Construction, Infrastructure - 3,900 SF
Sub-Bidding
$3,500,000 CJ est. value
Harbor Springs, MI 49740

North and West Conway Road Mill and Fill Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Petoskey, MI 49770

Catch Basin Rehabilitation
Infrastructure
Post-Bid
MI

Solanus Mission Beach Access and Environmental Enhancements
Infrastructure
Results
$301,755 CJ est. value
Petoskey, MI 49770

Atkins Road Undercut and Resurfacing
Infrastructure
Results
$800,000 CJ est. value
Resort Township, MI 49770

Victories Square LIHTC Building 4
New Construction, Infrastructure
Pending Verification
$12,843,928 CJ est. value
Resort Township, MI 49770

New K-4 Elementary School - 2022 Bond - Harbor Springs Public Schools
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Harbor Springs, MI 49740

O'Reilly Auto Parts (BCT) / Bear Creek Township
New Construction, Infrastructure
Design
$400,000 CJ est. value
Resort Township, MI 49770

Install Outdoor Exercise Equipment Along Warrior Trail
Infrastructure
Post-Bid
$200,000 CJ est. value
Harbor Springs, MI 49740

Harbor Springs High School Remodel - 2022 Bond - Harbor Springs Public Schools
Build-out, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Harbor Springs, MI 49740

RFQ D/B - Hatchery Barn
New Construction, Infrastructure
Post-Bid
$190,000 CJ est. value
Levering, MI 49755

Last Updated 03/02/2023 08:08 AM
Project Title

Replacement of the Culvert and Slope Stabilization on M-119

Physical Address View project details and contacts
City, State (County) Harbor Springs, MI 49740   (Emmet County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,875,888 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

0.10 mi of replacement of the culvert and slope stabilization on M-119 between Emmet Heights Road and Hoyt Road in the city of Harbor Springs, Emmet County. Control Sec Job No Federal No ST 24051 204987A 23A0155 Letting No- 230106 Net classification required for this project is 1358 Ea or 1358 Fa MI DOT - 2301 037 - Replacement of the Culvert and Slope Stabilization on M-119 Completion- 9/27/2024 MBE (4.9%), WBE (6.9%), DBE (5%)

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents