Similar Projects
Clearwater Multimodal Transit Center
New Construction - 75,000 SF
Conception
$34,000,000 est. value
Clearwater, FL 33757

Port St. Lucie Intermodal Facility
New Construction
Conception
FL

FL Keys Marathon Airport Non-Aeronautical Use Building (EOC)
- 23,000 SF
Design
Marathon, FL

Ground Transportation Center Project
New Construction
Design
Sarasota, FL 34243

Airside A Passenger Boarding Bridge Replacement At Tampa International Airport
Post-Bid
Less than $20,497,996 est. value
Tampa, FL 33607

MIA- New Elevator at E-Satellite
Post-Bid
Miami, FL 33126

Terminal Renovation and Expansion at Orlando Melbourne International Airport
Renovation
Results
Melbourne, FL 32901

Design/Build Firms for the Buildout of STC Airline and Tenant Spaces Program
Build-Out
Results
Orlando, FL 32827

Jetscape Westside Development
New Construction - 121,287 SF
Construction
$20,000,000 est. value
Fort Lauderdale, FL 33315

Norwegian PortMiami Terminal B
New Construction - 166,500 SF
Construction
$215,000,000 est. value
Miami, FL

Lilium Vertiports
New Construction
Pending Verification
Orlando, FL

Ferry Expansion
New Construction
Pending Verification
Redwood City, San Francisco, CA - Mission Bay, FL 94158

Terminal Expansion and Renovation - Apron Reconstruction/Expansion Project
Renovation, Addition
Post-Bid
Melbourne, FL 32901

Construction of Satellite Concourse "C" at VPS
Results
Eglin AFB, FL 32542

Virgin Voyages - Terminal V
New Construction
Construction
$150,000,000 est. value
Miami, FL

Last Updated 12/27/2021 07:02 AM
Project Title

Design Build Services for Terminal Second Floor Renovation

Physical Address View project details and contacts
City, State (County) Lakeland, FL 33811   (Polk County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation Of An Existing Office Space As Well As Improvements To Public Areas On The Second Floor Of The Terminal Building. Limited Demolition Involving The Upgrade Of The Public Restrooms And Several Walls And Flooring Inside The Office Space Is Required. Public Area And Office Space Improvements Will Include But May Not Be Limited To New Fixtures, Cabinetry, Paint, Flooring, Power And Data Drops, As Well As Workstations

Details

Airline/Passenger Terminal, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents