Similar Projects
Moose Lake Multi-Use Trail Phase I
Infrastructure
Bidding
MN

Balsam and Spruce Reconstruction
Infrastructure
Bidding
La Crescent, MN 55947

Sakatah Singing Hills State Trail Lime Valley Slope Failure
Post-Bid
Less than $356,970 est. value
Mankato, MN

Phase 3A-2 Infrastructure Improvements
Post-Bid
Tracy, MN

South Lake Minnetonka Public Safety Facility Improvements
Results
Shorewood, MN

Brookdale Park Neighborhood Reconstruction
Results
Less than $5,900,000 est. value
Brooklyn Park, MN 55444

Sidewalk Expansion Gaps
Infrastructure
Bidding
Coon Rapids, MN 55433

New Heights Elementary School, South Point Elementary School, Central Middle School - 2021 Improvements
Post-Bid
East Grand Forks, MN 56721

2021 Street Reconstruction Project Grading, Base, Bituminous Surfacing, Concrete Curb and Gutter, Storm Sewer and Water Main
Results
Less than $4,600,000 est. value
Plymouth, MN

Plymouth Creek Park Parking Lot Reconstruction Grading, Base, Bituminous, Concrete Curb and Gutter and Storm Sewer
Infrastructure
Bidding
$580,000 est. value
Plymouth, MN

Woodland Park and Ride Refurbishment
Post-Bid
$90,000 est. value
Duluth, MN 55803

2021 Street and Utility Improvements
Results
Belle Plaine, MN

North Parking Lot Maintenance
Infrastructure
Bidding
Alexandria, MN 56308

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

2021 Street and Miscellaneous Paving Improvements
Results
North Mankato, MN

Last Updated 06/21/2021 12:15 PM
Project Title

Parking Lot Improvements at the Mankato Minnesota National Guard Armory

Physical Address View project details and contacts
City, State (County) Mankato, MN 56001   (Blue Earth County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: 1. Replacement of existing bituminous parking lot surface. 2. Replacement of existing catch basins. 3. Partial replacement of existing concrete sidewalks. 4. Partial replacement of existing concrete curbs.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents