Similar Projects
Last Updated | 06/12/2023 03:37 AM |
Project Title | Canandaigua Airport GA Terminal Building - Contract #1- General Construction |
Physical Address | View project details and contacts |
City, State (County) | Canandaigua, NY 14424 (Ontario County) |
Category(s) | Heavy and Highway, Transportation |
Sub-Category(s) | Airline/Passenger Terminal, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,344,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Disadvantaged Business Enterprise Utilization Goal is 5.2%. The EEO goal for the Contractors work force is 5.3% for Minority participation and 6.9% for Women participation. From the time of advertising until the actual bid opening for this Contract, all prospective Bidders, Contractors, Subcontractors, and Suppliers shall direct all technical inquiries related to this project solely to Adam J. Frosino, from McFarland-Johnson at (585) 905-0970, extension 3460 or afrosino@mjinc.com The deadline for submitting inquiries related to this project is at 10:00 a.m. local time on Thursday, May 11, 2023. FAA AIP NO. 3-36-0093-0XX-20XX o Coordination with the project owner, other contractors o Installation of building foundation o Supply and construction of the single story terminal building o Supply and installation of building insulation, interior finishes and exterior building facade o Supply and installation of building windows and doors o Installation of concrete floor slab, subbase, insulation and vapor barrier o Installation of parking lot including pavement markings, asphalt pavement, subbase and stabilization fabric o Installation of concrete sidewalks, curbing and patio areas o All excavation, backfill, compaction and restoration o All excavation, backfill, and restoration for utility trenches o Installation of the proposed septic tank and leach field o Installation of all site drainage pipes, end section and stone linings. o Soil erosion control o Site grading, topsoil and seeding. o All construction safety and phasing plan requirements. o All other general construction contract work covered by plans and specifications. A Cashier's Check, drawn upon a state of national bank, or a Proposal Bond with a Surety's Bond Affidavit, in the penal sum of five percent (5%) of the total maximum bid price will be required with each bid Proposal. For purposes of this solicitation, New York State has established an overall goal of 30% for MWBE participation, 12% for Minority-Owned Business Enterprises ("MBE") participation and 18% for Women-Owned Business Enterprises ("WBE") participation. The low bidder must submit an M/WBE utilization plan to the Project Sponsor between letting and award. This utilization plan should document commitments to employ qualifying M/WBE contractors for at least the portion of work assigned by the goals. Goals for minority participation for each trade 5.3% Goals for female participation for each trade 6.9% OCIDA reserves the right to reject any and all bid Proposals and to waive any informality in bid Proposals received. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |