Similar Projects
Plumbing And Mechanical Services
Alteration
Post-Bid
Shreveport, LA 71115

Mechanical and Electrical Repairs to the Louisiana Black History Hall of Fame at the Lincoln Theater
Alteration
Post-Bid
Baton Rouge, LA 70802

Main Branch Library Boiler Replacement
Alteration
Results
$325,000 est. value
Baton Rouge, LA 70806

Hurricane Laura (Dr-4559-La) Disaster Recovery Program Water Treatment Plants – Chemical Feed System Repairs
New Construction, Alteration
Results
$450,000 est. value
Lake Charles, LA 70601

Jourdan Road Terminal Cold Storage Expansion Refrigeration System Installation
Renovation, Alteration
Post-Bid
New Orleans, LA 70126

Monitoring and Maintaining Lapalco Decorative Fountain Systems
Term Contract
Results
Gretna, LA

Remove and Replace Boiler - DVA
Alteration
Post-Bid
Bossier City, LA 71112

Restoration of Hurricane Damage to the Cafeteria/Band Building at Gueydan High School
Renovation, Infrastructure, Alteration
Results
LA

Boiler Removal and Replacement for DVA
Alteration
Post-Bid
Baton Rouge, Bossier City, LA 71112

Siemens Apogee Building Automated Systems And Mechanical Systems
Term Contract, Infrastructure
Results
Gretna, LA

Airport Boiler Repair - Pot Feeder
Alteration
Post-Bid
New Orleans, LA

MJCIDI Fittings
Infrastructure
Results
$150,000 est. value
Shreveport, LA

Airport - Temporary Boiler
Alteration
Post-Bid
Kenner, LA

Walk-in-Cooler and Freezer Replacement and Installation
Alteration
Results
Baton Rouge, LA

Commercial Water Heater
Alteration
Post-Bid
Farmerville, LA 71241

Reported 12/24/2021 12:00 AM
Project Title

South Terminal Chiller #9 Repair

Physical Address View project details and contacts
City, State (County) Kenner, LA 70062   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To repair of emergency valve/seal for South Campus Chiller #9.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents