Similar Projects
Last Updated | 01/10/2023 10:40 AM |
Project Title | Springtree Wastewater Treatment Plant Storage and Equipment Building - City of Sunrise |
Physical Address | View project details and contacts |
City, State (County) | Sunrise, FL 33322 (Broward County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,310,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | UPDATE: https://www.sunrisefl.gov/home/showpublisheddocument/7691/638043009402670000 The City recently replaced Hight Service Pump (HSP) Station "A" at Springtree WTP with exterior slab mounted pumps and the existing maintenance building has aged to its useful life and requires replacement. This project provides for replacement of the maintenance building and additional storage lost from the demolition of HSP Station "A" building. The new building will be approximately 6,000 square feet. It will be located on the adjacent parcel that the City Purchased in 2016. The site will be cleared of all remaining foundations and structures and will be enclosed with a wall to match the existing wall around the plant. This project will have a solar photovoltaic array on the roof capable of producing approximately 10 kwh of power to operate the building during the day. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of November 21, 2022, further details regarding design and construction have not been identified. _____________________________________________________ A more detailed scope is expected to be released on a future date. As of July 11, 2022, this project is in the design phase. A consultant and architect have been selected for the project. Per the owner, bidding is estimated to take place in late summer of 2022, and construction is estimated to take place in January of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, Addition.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |