Similar Projects
Country Club Ranches Water Main Improvements - Phase 1 - 52076 - City of Miramar
Infrastructure
Conception
$7,000,000 CJ est. value
Miramar, FL 33025

Harbor Beach Sewer Basin D34 Rehabilitation - P12465 - City of Fort Lauderdale
Renovation
Conception
$1,427,575 CJ est. value
Fort Lauderdale, FL 33301

Waves Dania Beach Mixed-Use
New Construction, Infrastructure - 1,300,000 SF
Design
$200,000,000 CJ est. value
Dania Beach, FL 33004

Arthur Street Multifamily
New Construction, Infrastructure - 13,783 SF
Design
$2,300,000 CJ est. value
Hollywood, FL 33020

Richard E. Giusti Heart Par Cours Park Improvements
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Oakland Park, FL 33334

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

Inflow and Infiltration Phase 2A Lateral Televising and Lining Project
Infrastructure
Post-Bid
$2,022,900 CJ est. value
Hallandale Beach, FL 33009

River Oaks Stormwater Improvements (P11868)
Infrastructure
Results
$22,093,982 CJ est. value
Fort Lauderdale, FL 33301

Tradewinds Park Educational Farm and Gardens
New Construction
Results
$8,500,000 est. value
Coconut Creek, FL 33066

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Millennium Townhouses
New Construction, Infrastructure - 10,916 SF
Construction
$4,000,000 CJ est. value
Fort Lauderdale, FL 33305

RFQ - Redevelop the Existing East and West Buildings of the Fort Lauderdale Aquatic Complex
Demolition, New Construction, Infrastructure
Pending Verification
$70,900,000 CJ est. value
Fort Lauderdale, FL 33316

New River Central
New Construction, Infrastructure - 5,697 SF
Pending Verification
$125,000,000 CJ est. value
Fort Lauderdale, FL 33301

Dolphin Isles B-14 Sewer Basin Rehabilitation - 12618 - City of Fort Lauderdale
Renovation
Conception
$4,656,051 CJ est. value
Fort Lauderdale, FL 33301

Atria
Demolition, LEED Certification, New Construction, Infrastructure - 54,600 SF
Design
$35,000,000 CJ est. value
Hollywood, FL 33020

Last Updated 01/10/2023 10:40 AM
Project Title

Springtree Wastewater Treatment Plant Storage and Equipment Building - City of Sunrise

Physical Address View project details and contacts
City, State (County) Sunrise, FL 33322   (Broward County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,310,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UPDATE: https://www.sunrisefl.gov/home/showpublisheddocument/7691/638043009402670000 The City recently replaced Hight Service Pump (HSP) Station "A" at Springtree WTP with exterior slab mounted pumps and the existing maintenance building has aged to its useful life and requires replacement. This project provides for replacement of the maintenance building and additional storage lost from the demolition of HSP Station "A" building. The new building will be approximately 6,000 square feet. It will be located on the adjacent parcel that the City Purchased in 2016. The site will be cleared of all remaining foundations and structures and will be enclosed with a wall to match the existing wall around the plant. This project will have a solar photovoltaic array on the roof capable of producing approximately 10 kwh of power to operate the building during the day. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of November 21, 2022, further details regarding design and construction have not been identified. _____________________________________________________ A more detailed scope is expected to be released on a future date. As of July 11, 2022, this project is in the design phase. A consultant and architect have been selected for the project. Per the owner, bidding is estimated to take place in late summer of 2022, and construction is estimated to take place in January of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents