Similar Projects
2023 Water Main Improvements - CAP2310 - City of Royal Oak
Infrastructure
Conception
$1,400,000 est. value
Royal Oak, MI

2023 Normandy Road Resurfacing (Water Main Improvements) - CAP2308 - City of Royal Oak
Alteration
Conception
$2,735,000 est. value
Royal Oak, MI 48073

Water System Installation and System Valve Replacement
Term Contract
Bidding
$70,000 est. value
Pontiac, MI

2022 Asbestos Cement Watermain Replacement
Infrastructure
Bidding
$200,000 est. value
Novi, MI

Lead Service Line Replacement
Infrastructure
Post-Bid
$5,000,000 est. value
MI

Replacement Water Main Phase II
Alteration
Post-Bid
Rochester, MI 48309

Lead Service Line Replacement and Service Line Materials Verification Program
Results
Ferndale, MI

2021 Water Main Improvement Project
Results
Less than $1,921,150 est. value
Ferndale, MI 48220

Water System Materials
Term Contract
Bidding
Troy, MI

Royal Oak Township Lead Service Line Replacement
Alteration
Post-Bid
Ferndale, MI

2021 Water Mains Axtell Drive, Maxwell Drive, Stutz Drvie
Results
Troy, MI 48084

Benstein Water Main Phase 1
Alteration
Post-Bid
Commerce, MI

2021 Water Main Improvements Contract Cap2010
Results
Less than $3,645,169 est. value
Royal Oak, MI 48067

13 Mile Road Water Main Extension Project
Infrastructure
Post-Bid
$600,000 est. value
Farmington Hills, MI 48332

2021 Water Main Replacement and Road Reconstruction Program
Results
Bloomfield Hills, MI 48304

Reported 06/15/2022 09:28 AM
Project Title

Stephenson Water Main - CAP2212 - City of Royal Oak

Physical Address View project details and contacts
City, State (County) Royal Oak, MI 48068   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $1,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Royal Oak, Michigan. Conceptual plans call for site work for a water / sewer project. MI-75 construction 12" water main on southbound Stephenson service drive (Fourth to north of Gardenia) in combination with road reconstruction work. As of June 13, 2022, this project is included in the City of Royal Oak FY 2022-2027 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents