Similar Projects
Water Main Replacement
Design
Elmwood Park, IL

Comprehensive Fire Hydrant Maintenance
Term Contract
Bidding
Tinley Park, IL

Water System Distribution Maintenance
Alteration
Bidding
$600,000 est. value
Lyons, IL

Term Agreement for Water Main Construction - District Two
Term Contract
Post-Bid
Chicago, IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

Water Meter Replacement Program
Infrastructure
Bidding
Harvey, IL

Water Supply Leak Detection Survey
Post-Bid
Park Ridge, IL 60068

Term Agreement for Water Main Construction - District Three
Term Contract
Results
Chicago, IL

2021 Roadway Resurfacing and Water Main
Infrastructure
Bidding
Hanover Park, IL

Basement Water Main Pipe
Renovation
Post-Bid
Park Forest, IL 60466

Term Agreement for Water Main Construction - District One
Term Contract
Results
Chicago, IL

Large Meter Testing
Infrastructure
Bidding
Elgin, IL

On-Call Emergency And Routine Water System Repair Services
Post-Bid
Broadview, Westchester, IL 60155

Last Updated 06/18/2021 08:50 AM
Project Title

Valve Actuator Replacement

Physical Address View project details and contacts
City, State (County) Oak Park, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contractor shall remove existing actuators from valves 2. Contractor shall install new actuators to existing valves 3. Contractor shall furnish all labor, equipment, and services involved in providing fully functional actuators, including but not limited to: power connections, control wiring, and mechanical connections 4. Wiring related only to SCADA system shall be performed by the Village’s SCADA integrator; actuators shall not be considered fully functional until proper SCADA operations have been confirmed 5. Existing electrical safety switches shall be used 6. Contractor shall be solely responsible to research and provide actuators that meet all criteria detailed in this RFB 7. Contractor shall perform all calibration and configuration services to actuators including but not limited to: open/close speed, open/close torque, open/close limits 8. Contractor shall provide start-up services to actuators 9. Contractor shall provide wiring diagrams of actuators

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents