Similar Projects
Figueroa Ave WPCF Facility Improvements
Renovation
Conception
$61,500,000 est. value
Yuma, AZ 85364

WRF Expansion Construction
New Construction
Conception
$1,800,000 est. value
Casa Grande, AZ

Water Reclamation Facility #6 Phase 1
New Construction
Design
$12,000,000 est. value
Buckeye, AZ

Wastewater Treatment Plant Headworks Improvements
Renovation
Design
Phoenix, AZ

WWTP Clarifier Rehabilitation Project
Renovation
Bidding
Globe, AZ

Wastewater Treatment Plant, Biosolids Transport and Disposal
Term Contract
Post-Bid
Show Low, AZ

Wastewater Treatment Plant Modifications
Demolition
Post-Bid
Clifton, AZ

Water and Wastewater Vulnerability Assessment and Related Services
Term Contract
Results
Less than $75,000 est. value
Scottsdale, AZ 85258

Northwest Water and Wastewater Master Plan Package 4
Results
$37,000,000 est. value
Phoenix, AZ 85003

Transfer Station
New Construction - 10,500 SF
Pending Verification
Gilbert, AZ

Wastewater Operator and Repair Services for Picacho Peak State Park
Post-Bid
Picacho, AZ 85141

Northwest Water and Wastewater Master Plan Package 2
Results
$15,000,000 est. value
Phoenix, AZ 85003

Repair to Waste Water Treatment Plant 2, Ft. Huachuca, Arizona
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Fort Huachuca, AZ 85613

Northwest Water and Wastewater Master Plan Package 3
Results
$37,000,000 est. value
Phoenix, AZ 85003

Medium Coarse Headworks Bar Screen And Washer
New Construction
Post-Bid
Somerton, AZ

Reported 03/03/2022 07:47 AM
Project Title

Central WWTP Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Buckeye, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method
Project Status Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct the Phase 2 improvements at the Central WWTP, which includes Train C, IMLR blower, belt press, effluent tank, to bring plant to its full permitted capacity of 4.5 MGD.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents