Similar Projects
Electric Bus Charging Stations - Orangeburg - Paving
Infrastructure
Bidding
$25,000 CJ est. value
Orangeburg, SC 29115

Whittaker Library ADA Improvement
New Construction, Infrastructure, Renovation
Bidding
$285,000 CJ est. value
Orangeburg, SC 29115

Railroad Corner Mixed Use Development
New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Orangeburg, SC 29115

Domestic Violence Shelter
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Orangeburg, SC 29115

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Bridge Replacement - US 301 (North Edisto River)
Demolition, New Construction, Infrastructure
Results
$30,297,350 CJ est. value
Orangeburg, SC 29115

Pet Supplies Plus Distribution Hub - Shamrock Commerce Park / Orangeburg
New Construction, Infrastructure
Construction
$53,000,000 CJ est. value
Orangeburg, SC 29115

2022 Bond - Orangeburg County Schools
New Construction, Renovation, Infrastructure
Pending Verification
$190,000,000 CJ est. value
Holly Hill, SC 29059

Academy Lane - Holly Hill Residential Subdivision
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Holly Hill, SC 29059

Pine Top Roadway Repairs
Infrastructure
Bidding
$700,000 CJ est. value
Orangeburg, SC 29115

Stump Piling Shredding
Infrastructure
Post-Bid
$100,000 CJ est. value
Orangeburg, SC 29118

Britain Street Water Extension
Infrastructure
Results
$93,845 CJ est. value
Santee, SC 29142

BRD Land Old Number Six Highway Residential
New Construction, Infrastructure
Pending Verification
$175,000,000 CJ est. value
Vance, SC 29163

Phase 2 OSP Procurement Installation / Construction
Infrastructure
Bidding
$265,000 CJ est. value
Orangeburg, SC 29115

Outside Splicing Project - Orangeburg Fiber
Infrastructure
Post-Bid
$250,000 CJ est. value
Orangeburg, SC 29115

Last Updated 03/22/2023 11:06 AM
Project Title

Premium Peanut Production Facility

Physical Address View project details and contacts
City, State (County) Santee, SC 29142   (Orangeburg County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $64,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 20, 2023, the project is in final planning. No applications or building permits have been submitted into the Orangeburg County. A genreal contractor has been selected and all trades are let. Site work is currently underway and vertical construction is anticiapted to begin in April 2023 and take approximately 5 months to complete. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents