Similar Projects
Jones Ferry Wastewater Pump Station Improvements Phase 2 - General Bids
New Construction
Bidding
Less than $4,100,000 est. value
Chicopee, MA 01021

2021 Pump Station Improvements - General Bid
Bidding
$735,000 est. value
Hyannis, MA

Jones Ferry Wastewater Pump Station Improvements - Phase 2 - Filed Sub Bids
Sub-Bidding
Less than $4,100,000 est. value
Chicopee, MA 01021

2021 Pump Station Improvements - Sub Bid
Sub-Bidding
$735,000 est. value
Hyannis, MA

Amherst-Pelham Regional Middle School Pump Room
Renovation
Post-Bid
Amherst, MA 01002

Maintenance and Repairs to the Water and Wastewater Pumping Stations
Post-Bid
Less than $100,000 est. value
Salem, MA

Hillside Pump Station Upgrades - General Bid
Results
Less than $450,000 est. value
Milton, MA 02186

Endicott Street Wastewater Ejector Pumping Station Replacement Project
Results
Less than $1,500,000 est. value
Danvers, MA 01923

Downtown Area Collection System and Pumping Stations
Construction
$13,000,000 est. value
Orleans, MA 02653

Pump Station No 1 Rehabilitation Project - General Bids
Bidding
$1,150,000 est. value
Dudley, MA 01571

Pump Station No. 1 Rehabilitation Project - Filed Sub-Bids
Sub-Bidding
$1,150,000 est. value
Dudley, MA 01571

Construct New West Peabody Pump Station - Sub Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Beverly Pump Station Bar Rack Replacement - General Bid
Results
Less than $1,300,000 est. value
Salem, MA

Construct New West Peabody Pump Station - General Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Folly Hill Chlorine Booster - General Bid
Results
Less than $340,000 est. value
Danvers, MA 01923

Last Updated 01/19/2021 08:02 AM
Project Title

Well Pumping Station 1 Rehabilitation, Treatment Building 3 and Appurtenant Work - Filed Sub-Bids

Physical Address View project details and contacts
City, State (County) Barnstable, MA 02630   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,350,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Generally consists of 1) installation of chemical feed equipment, chemical storage equipment, and associated components in a new prefabricated building; 2) rehabilitation of the existing pumping station including architectural, structural, electrical, painting and mechanical modifications; and 3) installation of an outside generator with automatic transfer switch within the facility, and associated gas piping and electrical work.

Details

Division 09 - Finishes, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents