Similar Projects
Brown School/Gym Renovations - City of Newburyport
Renovation
Conception
$1,100,000 CJ est. value
Newburyport, MA 01950

Nock/Molin-Gym & Auditorium Roof Replacement - City of Newburyport
New Construction, Infrastructure
Conception
$662,265 CJ est. value
Newburyport, MA 01950

Martin Richard Dorchester Field House
New Construction - 73,000 SF
Design
$30,000,000 est. value
Boston, MA 02125

Sparks Avenue Mixed-Use Development
New Construction - 111,360 SF
Design
$10,000,000 CJ est. value
Nantucket, MA 02554

F45 Fitness Center
Renovation, Demolition - 2,568 SF
Post-Bid
Allston, Boston, MA 02134

F45 Training
Build-Out - 2,476 SF
Post-Bid
Swampscott, MA 01907

Memorial Swimming Pool Improvements - Sub Bid
New Construction, Renovation, Infrastructure
Results
$410,490 CJ est. value
Weston, MA 02493

The Ceintures
New Construction - 78,432 SF
Construction
$11,000,000 est. value
South Boston, MA 02127

1700-1710 Dorchester Avenue
New Construction - 96,394 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Dorchester, MA 02122

Grove Street Units
New Construction
Pending Verification
Salem, MA

Boston College High School - Phase 2
New Construction, Renovation
Pending Verification
Boston, MA 02125

Upgrade HVAC System at Fredrick M. Bartek Recreation Center - City of Attleboro
Renovation
Conception
$500,000 CJ est. value
Attleboro, MA 02703

The Little Gym
Build-Out - 7,500 SF
Post-Bid
Westborough, MA 01581

EZIA Athletic Club
Renovation - 5,048 SF
Construction
$2,000,000 est. value
Nantucket, MA

Next Generation Elite Fitness
New Construction
Pending Verification
Fitchburg, MA 01420

Last Updated 04/26/2023 10:29 AM
Project Title

Crystal Lake Bathhouse - Renovate, Replace - City of Newton

Physical Address View project details and contacts
City, State (County) Boston, MA 02135   (Suffolk County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2026
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 26, 2023, further details regarding design and construction have not been identified. This project is included in the City of Newton Capital Improvement Plan fiscal year 2024-2028. A firm timeline for construction has not been established. The closed solicitation has been included below for reference. Existing bathhouse is in poor condition with limited accessibility. Renovate/Replace bathhouse and improve swim beach front. Built in 1931, this is a 9,581 square foot seasonal building that provides restrooms and changing facilities for use of the Crystal Lake Public Beach for approximately two months during the summer. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents