Similar Projects
New Drinking Water Well - City of Woodstock
New Construction, Infrastructure
Conception
$1,750,000 CJ est. value
Woodstock, IL 60098

Southern Service Area Lift Station - 19-PWSew-002 - Village of Huntley
Infrastructure
Conception
$2,850,000 CJ est. value
Huntley, IL 60142

Residences of Fox Meadows
New Construction, Infrastructure
Design
$205,000,000 CJ est. value
Nunda Township, IL 60050

McHenry County SportsPlex / Lakewood Community Center / Chicagoland Sportsplex
New Construction, Infrastructure - 150,000 SF
Design
$45,000,000 CJ est. value
Woodstock, IL 60098

Reconstruct Souwanas Trail
Infrastructure
Bidding
$5,907,383 CJ est. value
Algonquin, IL 60102

Sidewalk, Curb and Gutter, Decorative Brick Crosswalks and Banding, ADA Ramps
Infrastructure
Bidding
$200,000 CJ est. value
Harvard, IL 60033

Two Acre Commercial or Mixed-Use Development Opportunity Developers
Term Contract
Post-Bid
$500,000 est. value
Fox River Grove, IL 60021

Adaptive Reuse of Property
Infrastructure
Post-Bid
Cary, IL 60013

Holiday Hills/ Le Villa Vaupell Sewer Extension - Phase 1
Infrastructure
Results
$6,227,127 CJ est. value
Island Lake, IL 60042

Mill and Dean Watermain Replacement
Infrastructure
Results
$815,146 CJ est. value
Huntley, IL 60142

Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue
Infrastructure
Construction
$27,554,453 CJ est. value
Woodstock, IL 60098

Three Oaks Recreation Area Pole Barn Cold Storage Building Re-Bid
New Construction, Infrastructure
Construction
$221,576 CJ est. value
Crystal Lake, IL 60014

AZE Distribution Center
New Construction, Infrastructure - 175,600 SF
Pending Verification
$19,000,000 CJ est. value
Huntley, IL 60142

Enclave Apartments and Town Homes
New Construction, Infrastructure - 7,100 SF
Pending Verification
$20,000,000 CJ est. value
Crystal Lake, IL 60014

Huntley-Dundee Sanitary Sewer Replacement - 22-PWSew-004 - Village of Huntley
Infrastructure
Conception
$275,000 CJ est. value
Huntley, IL 60142

Last Updated 02/14/2023 05:27 PM
Project Title

Hebron-alden-greenwood Fire Protection District (Hagfpd)

Physical Address View project details and contacts
City, State (County) Hebron, IL 60034   (McHenry County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the demolition of the existing building south of the main apparatus bay and the construction of a new, wood-framed addition to house a community room, administrative offices, sleeping units and a dayroom for firefighter use. All emergency operations must remain operational during all phases of construction. Any Requests for Information (RFI) shall be submitted via email to Zach Enderle, Vice President, 1919 Architects, P.C. (zach@1919architects.com) no later than 5:00 p.m. local time on the 3rd day of February 2023. BID BOND: Bid Bond executed by the bidder and acceptable sureties in an amount of not less than 5% of the base bid shall be submitted with each bid. Failure to submit an acceptable bid bond with the bid will result in the rejection of the bid. Bid Bond shall be in the form of an approved insurance company Bid Bond or a Cashier's Check issued to HAGFPD. PAYMENT AND PERFORMANCE GUARANTEE: The successful bidder shall be required to provide a Performance Bond in the sum equal to One Hundred Percent (100%) of the amount of the bid, with sureties to be approved by the District. Said bond shall be conditioned upon proper and faithful performance by the Contractor of the Work specified in accordance with the plans and specifications and according to the time, terms, and conditions of the contract. WAGE RULES/PREVAILING WAGES/AFFIRMATIVE ACTION/EEOC: Work performed under this contract shall be in accordance with Illinois Prevailing Wage Act (820 ILCS 130/1, et seq.), the Substance Abuse Prevention on Public Works Projects Act (820 ILCS 265/1, et seq.), Drug Free Workplace Act (30 ILCS 580/1, et seq.), and any applicable superseding ordinance or public law. Attention is called to the provisions for Equal Employment Opportunity Act. All Contractors who are awarded construction related contracts must document Affirmative Action to ensure Equal Opportunity in Employment. This documentation is subject to review by the Regional Office of the Department of Labor. As a part of normal contract administration, HAGFPD is responsible for determining the Contractor's compliance with the Equal Employment Opportunity Clause and Affirmative Action Requirements as well as the Contractor's performance in executing those requirements. HAGFPD is exempt from the Illinois State, municipal, or county Retailers Occupational Tax, Service Occupation Tax, Use Tax, and Service Use Tax as described in the Illinois Compiled Statute Chapter 35. Bid prices shall not include the cost of such taxes. Each bid shall include all elements of construction to furnish all labor, materials, equipment, applicable taxes, and all other expense items to completely perform the work required. Bids will be held good and may not be withdrawn for a period of ninety (90) calendar days from the date of opening without the written consent of the District. All MBE/DBE/WBE Contractors, Subcontractors and Suppliers are encouraged to participate on District projects. The District reserves the right to reject any or all Bids and to waive any irregularities and/or reject any or all bids when, in the District's opinion, such action will serve the best interest of the District. The District also reserves the right to cancel the bidding process before bid envelopes are opened.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents