Similar Projects
New Court Administrative Building
New Construction - 28,000 SF
Conception
$13,662,000 est. value
Graham, NC

Public Buildings Bond Projects
Renovation
Conception
$3,750,000 est. value
Monroe, NC

New Town Hall
New Construction - 9,000 SF
Design
Summerfield, NC

Old Courthouse Renovations
Renovation
Bidding
$100,000 est. value
Greensboro, NC 27401

Judicial Building Elevators 6 and 7 Modernization
Renovation
Bidding
$200,000 est. value
Wilmington, NC

City Hall Improvements and Renovations
Renovation - 12,100 SF
Post-Bid
Siler City, NC 27344

Courthouse Repairs
Post-Bid
$100,000 to $250,000 est. value
Sparta, NC 28675

Plaza Repair Project - Wake County Courthouse
Results
Raleigh, NC

Alton Lennon Courthouse Disaster Relief Project
Results
$40,000,000 to $50,000,000 est. value
Wilmington, NC 28401

Historic Union County Courthouse Restoration and Renovation - Phase 1
Renovation
Construction
Monroe, NC 28112

Cabarrus County Courthouse - GMP2 Package
Construction
Concord, NC 28025

City Hall - 1st Floor Family Restroom
Addition - 80 SF
Post-Bid
Asheville, NC 28801

Lincoln County Courthouse
Results
Lincolnton, NC 28092

Pender County Courthouse - Interior Renovations
Construction
Burgaw, NC 28425

Structural Repairs Mann Hall
Term Contract
Post-Bid
$3,000,000 to $5,000,000 est. value
Raleigh, NC 27607

Last Updated 04/15/2022 08:16 AM
Project Title

Commissioners Meeting Room Commissioners Desk Renovations

Physical Address View project details and contacts
City, State (County) Lexington, NC 27292   (Davidson County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of existing Commissioner’s Desk, Commissioners Room carpet and base, Suspended drywall ceiling, Ceiling grid and ceiling tiles where indicated on the plans and minor electrical fixtures and HVAC grilles. Construction of architectural millwork desk, poured concrete raised floor platform and ramp, new step and ramp rails, half and full wall construction surrounding commissioner’s desk, installation of new suspended ceiling and grid where indicated on the plans, carpet tile flooring and wall base. Minor lighting and HVAC additions and adjustments. Cleaning of the new and original features of the Commissioners Meeting Room.

Details

Capitol/Court House/City Hall, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents