Similar Projects
Bruce Freeman Rail Trail
Bidding
Acton, MA

Sidewalk Construction
Bidding
Acton, MA

Walkway Replacement
Post-Bid
$20,000 est. value
North Billerica, MA 01862

Construction Management at Risk Services - Logan Express Parking Facility Expansion
Post-Bid
Less than $30,000,000 est. value
Framingham, MA

Patton Road Sidewalk Improvements Project
Results
$275,000 est. value
Devens, MA

Cement Concrete Sidewalks and Granite Curbing
Term Contract
Results
Belmont, MA

Sidewalk Construction Harris Street
Bidding
Acton, MA 01720

Thoreau House Site Trail Improvements
Post-Bid
$425,000 est. value
Concord, MA

Sidewalk and ADA Improvements at Various Locations
Results
Less than $416,336 est. value

2021 Parking Lots Rahanis Park
Bidding
Burlington, MA

Sidewalk Repairs
Post-Bid
$75,000 est. value
Somerville, MA

Sidewalk and ADA Improvements and Related Work (Including Signals) Along Sections of Routes 107, 127 And 129
Results
Less than $1,230,000 est. value

Sidewalk Repairs for the City
Bidding
Somerville, MA

Weston Manor Parking Lot Improvement Project
Post-Bid
Less than $46,000 est. value
Somerville, MA 02143

Lexington Community Center Walkway Improvements
Results
Less than $285,000 est. value
Lexington, MA 02420

Reported 10/29/2020 12:00 AM
Project Title

Everett Northern Strand Community Trail Extension

Physical Address View project details and contacts
City, State (County) Everett, MA 02149   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,535,813
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes construction of 4,000 linear feet of shared use path from the existing path head at West Street at the northerly limit, south through and adjacent to MBTA and DCR property, adjacent to the SITE Centers property connecting to the recently constructed river walk. Also included, but not limited to, in the construction scope are lighting, security equipment, fencing, paving, drainage, striping, boardwalk construction across wetlands, retaining walls, best management practices (BMPs) for erosion control, railroad track removal, wetlands mitigation/replication and landscaping improvements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents