Similar Projects
US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 2 - Arizona Department of Transportation (AZDOT)
Alteration
Conception
$41,000,000 est. value
Kingman, AZ 86401

Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1
Infrastructure
Design
$5,655,000 est. value
Kingman, AZ

I-11 Rancho Santa Fe TI - City Of Kingman
Infrastructure
Design
$48,817,815 est. value
Kingman, AZ

Horizon 6 Waterline Replacement
Infrastructure
Bidding
$7,000,000 CJ est. value
Lake Havasu City, AZ 86403

Topock-Kingman Hwy, (I-40) (Walnut Creek - Holy Moses Wash)
Infrastructure
Bidding
$38,500,000 CJ est. value
Kingman, AZ 86401

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

System Preservation
Infrastructure
Results
AZ

Street and Drainage Facilities
Infrastructure
Results
Kingman, AZ

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

I-11 Kingman Crossing Traffic Interchange - City of Kingman
Alteration
Conception
$31,500,000 est. value
Kingman, AZ 86401

US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 1 - Arizona Department of Transportation (AZDOT)
Infrastructure
Design
$70,000,000 CJ est. value
Kingman, AZ 86401

Pavement Rehabilitation
Infrastructure
Bidding
$38,500,000 CJ est. value
Kingman, AZ 86401

Last Updated 04/07/2023 02:32 AM
Project Title

City of Kingman Eastern Street Improvements Phase 1

Physical Address View project details and contacts
City, State (County) Kingman, AZ 86401   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,812,093 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of reconstructing Eastern Street from Calumet Avenue to Clark Street, the construction of a new section of Eastern Street from Clark Street to a new direct connection to Airway Avenue and the relocation of the existing traffic signal at the intersection of Airway Avenue and Yavapai Street to the new intersection of Eastern Street and Airway Avenue. The work generally consists of roadway, drainage and traffic signal improvements including removal of existing pavement, earthwork, new pavement section, constructing curbing, sidewalks, catch basins, a five-barrel box culvert, headwalls, concrete drainage pipes and relocating the existing traffic signal along with other associated improvements. Work shall be completed within 280 calendar days, beginning with the day following the starting date specified in the Notice to Proceed. Questions concerning the project requirements need to be directed to Eric Sparkman, P.E., Assistant City Engineer, telephone (928) 753-8134, fax (928) 753-8118, or email esparkman@cityofkingman.gov

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents