Similar Projects
Heritage Creekside Office Buildings
New Construction
Design
Plano, TX 75074

Acadian Office Park at Ridgeview - Shell Buildings
New Construction - 10,832 SF
Design
$700,000 est. value
Plano, TX 75025

Wraparound Services Center
New Construction, Infrastructure - 11,000 SF
Bidding
$4,600,000 CJ est. value
Dallas, TX 75252

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Post-Bid
$95,000,000 CJ est. value
McKinney, TX 75069

McKinney Educational Facility (Craig Ranch)
New Construction - 139,000 SF
Post-Bid
$38,500,000 est. value
McKinney, TX 75070

Trinity Forest Spine Trail Phase 1 - Site Development
Results
Dallas, TX

Excavation Improvements for Inspiration, Phase 4B
Results
TX

Stacy Green
New Construction
Construction
Allen, TX 75013

One Bethany West
New Construction
Construction
Allen, TX 75002

Interior Logic Group / The Offices 3 at Frisco Station
Renovation - 17,681 SF
Pending Verification
$1,150,000 CJ est. value
Frisco, TX 75034

Starbucks - Renner & PGBT
New Construction, Infrastructure - 2,063 SF
Pending Verification
$735,140 CJ est. value
Plano, TX 75074

The Rail District Development
New Construction - 37,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Frisco, TX

Carefree Covered RV Parking
New Construction - 229,495 SF
Post-Bid
Wylie, TX

Phase 1A and 1B - Grading Package for Waterford on the Lake - South
Infrastructure
Results
Celina, TX

Legacy West
New Construction - 105,000 SF
Construction
$10,000,000 CJ est. value
Plano, TX 75024

Last Updated 11/04/2022 10:59 AM
Project Title

McIntyre Road-Building 3

Physical Address View project details and contacts
City, State (County) McKinney, TX 75071   (Collin County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $12,326,600 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 4, 2022, this project has submitted plans for permit review and is currently in revisions. An architect has been assigned. The owner will be self-performing as general contractor. A firm construction timeline has not yet been established; however, construction is expected to take 1 year. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

168,840 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents