Similar Projects
Replacement of Chiller and Boilers at Rose Wagner Center
Renovation
Sub-Bidding
$790,000 CJ est. value
Salt Lake City, UT 84101

Salt Lake County Rose Wagner HVAC Upgrade
Renovation
Sub-Bidding
$800,000 CJ est. value
Salt Lake City, UT 84101

Canterbury Furnaces
Alteration
Post-Bid
Salt Lake City, UT

HVAC Generation 4/5 LG VRF System Service/Maintenance
Alteration
Post-Bid
Salt Lake City, UT

J041--660 - (S4) ** EMERGENT** Air Handler Repair Bldg 2 AHU Repairs
Term Contract
Results
Salt Lake City, UT 84148

SLCO ADC AHU Replacement
Term Contract
Results
$900,000 to $950,000 est. value
South Salt Lake, UT 84119

HVAC - University Hospital Provider Call and Workspace - HVAC and Controls
Renovation
Sub-Bidding
$547,932 CJ est. value
Salt Lake City, UT 84132

Airport Operations Center HVAC
Alteration
Post-Bid
Salt Lake City, UT 84122

Animal Shelter Boiler and Water Heater
Alteration
Results
South Salt Lake, UT 84115

729 Ar Inc Mri Chiller Replacement
Renovation
Sub-Bidding
$141,816 CJ est. value
Salt Lake City, UT 84108

University Of Utah Generator And Switches
Term Contract
Post-Bid
Salt Lake City, UT 84112

729 AR Data Room AC Replacement
Term Contract
Results
$105,000 est. value
Salt Lake City, UT

BEH S 025 AHU 1 System Upgrade
Alteration
Post-Bid
$190,217 est. value
Salt Lake City, UT 84112

DFCM Construction-Pre Qualified Mechanical-UNG Draper CSMS HVAC Repairs
Alteration
Results
$183,425 est. value
Draper, UT 84020

Install Rooftop HVAC Units
Alteration
Post-Bid
Riverton, UT

Last Updated 01/11/2023 05:14 PM
Project Title

Provide and Install New Booster Heater - Dilworth Elementary

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84111   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $12,405 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to remove and dispose of the old booster heater and furnish and install a new Hatco Model PMG-200 booster heater at Dilworth Elementary, 1953 S 2100 E., Salt Lake City, Utah per the specifications. The scope shall include the booster heater, complete installation, standard warranty, and removal/disposal of old unit. All work shall be in accordance with professional standards of the trade. This solicitation is issued for vendors to quote on a project to remove and dispose of the old booster heater, and furnish and install a new Booster Heater, Hatco Model PMG-200 or equivalent at Dilworth Elementary School, 19532 South 2100 East, SLC, Utah per the specifications contained herein. Successful vendor will be required to provide all equipment, labor, materials, delivery and warranty for a completed project as required herein. NOTE: This is a brand name or equal specification. Vendors who wish to offer/quote an alternate make and model must submit data sufficient to prove that the product is equal. Failure to do so will result in that quote being rejected as nonresponsive. ALSO NOTE: Your quote must include a completion date for delivery and installation. Enter delivery date information in the notes section of the RFQ or upload that information as a separate document. The quoted delivery time will be considered along with price in evaluating the quotes received. If the best delivery time is included with a quote that is not low but is close to the low quote, the district reserves the right to make the vendor selection based on the delivery time. Child health, safety, work load, and other considerations may all be factored into that decision. The determination as to what constitutes a quote that is close enough to justify a delivery based decision is at the sole discretion of the SLC School District. All questions regarding this solicitation must be asked in writing in electronically or at a pre-quote site visit. Answers to all questions will be provided in electronically. Only answers issued through the BidSync system or issued via an authorized and properly issued addendum shall be the official position of the SLCSD. NOTE: Your quote must include a completion date for delivery and installation. Enter that information in the notes section of the RFQ or upload that information as a separate document. The quoted delivery time will be considered along with price in evaluating the quotes received. If the best delivery time is included with a quote that is not low but is close to the low quote, the district reserves the right to make the vendor selection based on that delivery time. Child health, safety, work load, and other considerations may all be factored into that decision. The determination as to what constitutes a quote that is close enough to justify a delivery based decision is at the sole discretion of the SLC School District. Contract duration: One Time Purchase Contract renewal: Not Applicable Prices good for: 30 days Q & A deadline: Nov 14, 2022 9:00:00 AM EST

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents