Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Pavement Replacement
Infrastructure
Bidding
$280,000 est. value

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Bidding
$4,163,870 est. value

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Cold Plane AC Pavement, Place HMA and Replace Concrete Slabs
Infrastructure, Alteration
Post-Bid
$4,860,000 est. value
CA

Upper Multi-Purpose Area Repairs and Improvements Kiefer Landfill
Infrastructure
Results
$225,000 est. value
Sloughhouse, CA 95683

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Results
$5,400,000 est. value
Sacramento, CA

Duckhorn Drive Safety Improvement Project
Infrastructure
Post-Bid
$470,000 est. value
Sacramento, CA 95834

Hot Mix Asphalt (HMA) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
CA

Replace AC Surfacing, Place HMA (Type A), and Cold Plane AC pvmt
Infrastructure
Post-Bid
$960,000 est. value
CA

Power Inn Road Improvement Project
Infrastructure
Results
$3,208,000 est. value
Sacramento, CA 95811

Resurfacing Project
Term Contract
Post-Bid
$1,670,235 est. value
Sacramento, CA

Construction of Roadway Paving on Lytle Avenue from W. Cecil Way to County Line Road
Infrastructure
Results
$1,436,028 est. value
Delano, Sacramento, CA 95811

AC Overlay Phase Two
Infrastructure
Results
$6,800,000 est. value
Sacramento, CA

On Call Trench Repair Asphalt Paving Restoration
Infrastructure
Results
$650,000 est. value
Folsom, CA

Last Updated 04/08/2022 11:18 AM
Project Title

Power Line Road Improvement Project - Phase 1.5B

Physical Address View project details and contacts
City, State (County) Sacramento, CA   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and other incidental work for: clearing and grubbing, drainage improvements, widening the roadway to a two-lane arterial with a center turn lane, and doing all other work specified on the plans and in the special provisions.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents