Similar Projects
WIS 130, WIS 23 - Lone Rock, Wisconsin River Crossing
New Construction, Infrastructure
Bidding
$30,000,000 to $35,000,000 est. value
Lone Rock, WI 53556

Bridge 1-22 (Bridge Maintenance and Concrete Repairs)
Renovation
Bidding
$200,000 est. value
Green Bay, WI

Rehabilitation of the West Cherry Street Bascule Bridge Over the Milwaukee River
Post-Bid
Milwaukee, WI 53202

2021 Colley Road and Stateline Road Bridge Deck Sealing
New Construction, Infrastructure
Post-Bid
Beloit, WI 53511

Town of Ithaca, Mcavoy Hill Road, Little Willow Creek Bridge
Results
WI

CTH PF - US 12, Pine Creek Bridge
Results
WI

The Couture Apartments
New Construction
Construction
Milwaukee, WI 53202

Winneconne Avenue Bridge Repair
Renovation
Bidding
$169,000 est. value
Neenah, WI 54956

Rowan Creek Snowmobile Bridge Replacement
Post-Bid
WI

STH 130 - CTH G, Little Bear Creek Bridge
Results
WI

Bridge 3-22 (Ashland Avenue Over CNRR and 6th Street B 5 018 Expansion Joint Reconstruction)
New Construction
Bidding
$1,000,000 est. value
Green Bay, WI 54344

Snowmobile Bridge Replacement Spring Valley Creek - Dane 15 Bridge
New Construction, Infrastructure
Post-Bid
New Glarus, WI 53574

V. of Potosi, Brewery Hollow Road, Potosi Branch Bridge
Results
Potosi, WI 53820

Bridge 4-22 (Monroe Avenue Over East River B-5-255 Expansion Joint Reconstruction)
New Construction
Bidding
$1,000,000 est. value
Green Bay, WI 54344

Snowmobile Bridge Replacement Brewery Ditch - Dane 17 Bridge
New Construction, Infrastructure
Post-Bid
New Glarus, WI 53574

Last Updated 04/19/2022 04:00 AM
Project Title

Connors Creek ATV Trail Bridge Replacement

Physical Address View project details and contacts
City, State (County) Winter, WI 54896   (Sawyer County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $160,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: Replacement of a bridge over Connors Creek which is located on an ATV and snowmobile route within the Flambeau River State Forest. The bridge will be raised approximately 2-foot over the existing condition. About 135 linear feet of trail approaches consisting of gravel surface will be reconstructed to match into existing conditions. The bridge will be a panel laminated timber bridge and supported on timber abutments with helical piles

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents