Emerson Avenue Improvements
Design
$27,631,381 est. value
Indianapolis, IN 46204

IDIQ District Wide Bridge Maintenance
Bidding

Bridge Replacement
Bidding
IN

I Beams 6X9x20
Post-Bid
Indianapolis, IN 46077

Bridge Replacement
New Construction, Demolition
Post-Bid
Madison, IN 47250

Bridge Thin Deck Overlay
Results
IN

Bridge Thin Deck Overlay
Results
IN

Small Structure Pipe Lining
Bidding
IN

Bridge No. 62 on Stonington Road Over Fishing Creek
Post-Bid
Bedford, IN 47421

Bridge Deck Overlay
Results
IN

Bridge Replacement and Bank Stabilization in Brookshire Golf Club
New Construction
Bidding
Less than $1,000,000 est. value
Carmel, IN

Intersection Improvement and Small Structure Replacement
Post-Bid
Queensville, IN

Bridge Thin Deck Overlay and Small Structure Replacement
Results
IN

Bridge 174 and 175 Replacement
New Construction
Bidding
Lebanon, IN

Steuben County Bridge 17 Replacement Hanselman Road Over Pigeon Creek
Post-Bid
Angola, IN 46703

Reported 02/25/2021 03:29 AM
Project Title

Bridge Replacement

Physical Address View project details and contacts
City, State (County) Greenwood, IN 46143   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge Replacement on Smith Valley Road over Louisville and Indiana Railroad, (located approximately 0.46 miles east of US Highway 31 in Johnson County). • Overhead electric lines stay on the alignment as shown on the plans, marked by the OE designation, located approximately 12 feet east of the bridge’s west end bent. • Height from the existing bridge elevation to the electric distribution lines will be around 30 feet. • Height from the existing bridge elevation to the electric transmission lines will be around 45 feet. • Overhead electric lines are not able to be deenergized during construction. • Overhead utilities running east-west along the south side of the bridge will remain in place. • Railroad is open to allowing construction equipment within their right of way, up to 14 feet from the tracks.

Details

Bridge, Addition.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents