Similar Projects
Commodore Boulevard Widening - 64119 - City of Melbourne
Infrastructure
Conception
$2,250,000 CJ est. value
Melbourne, FL 32935

Kingsmill Subdivision Road Resurfacing and Reconstruction
Infrastructure
Conception
$1,000,000 CJ est. value
Melbourne, FL 32934

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Port Canaveral Master Plan: The Aquarium Project
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Port Canaveral, FL 32920

Viera Booster Station Chloramination Improvements
Renovation, Infrastructure
Bidding
$590,000 CJ est. value
Melbourne, FL 32940

Viera Booster Station Chloramination Improvements
Renovation, Infrastructure
Bidding
$590,000 CJ est. value
Melbourne, FL 32940

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Construct Utilities Flight Control Rd, CCSFS, FL
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Cape Canaveral, FL 32920

Lift Station No. 38
New Construction
Results
$98,819 est. value
Melbourne, FL 32901

Western Force Main to DB Lee
Results
$2,000,000 est. value
Melbourne, FL

Titusville Point - Site Development
New Construction
Construction
Titusville, FL 32780

Element by Marriott / Melbourne
New Construction, Infrastructure - 118,930 SF
Construction
$36,000,000 CJ est. value
Melbourne, FL 32903

Eau Gallie Office Park, Phase 6 - Makoto's Addition
Addition, Demolition, Renovation, Infrastructure - 3,913 SF
Pending Verification
$1,000,000 CJ est. value
Melbourne, FL 32934

SpaceX Operations Area / Kennedy Space Center
New Construction, Infrastructure - 480,000 SF
Pending Verification
$258,000,000 CJ est. value
Titusville, FL 32780

Tradewind Homes Subdivision Road Reconstruction
Infrastructure
Conception
$1,600,000 CJ est. value
Melbourne, FL 32901

Last Updated 11/10/2022 10:04 AM
Project Title

Lift Station #5 Relocation - 22WS21 - City of Palm Bay

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32905   (Brevard County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,271,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lift Station #5 is located near Florin Drive which connects to US-1. There is an opportunity to replace this lift station with a larger lift station that can accept additional sewage flow from other Lift Stations located on US-1 and south of Florin Drive. Sewage can be diverted west instead of north, which will reduce the amount of sewage that enters Lift Station 47. Lift Station 47 is low-lying, located on the Turkey Creek, and can be susceptible to overflows. The project involves the full replacement of Lift Station #5 and the installation of approximately 4,200 linear feet of force main to be installed along Florin Drive NE and Port Malabar Boulevard NE. This project is in included in the City of Palm Bay FY 2023-2027 Capital Improvement Plan (CIP). As of November 10, 2022, information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents