Similar Projects
Last Updated | 10/11/2022 04:31 AM |
Project Title | Supply and Install of Water Lines and Pipes |
Physical Address | View project details and contacts |
City, State (County) | Concord, NH 03301 (Merrimack County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected November 2022 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ** As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information. Avalanche Trail: 1. Water 6 .280W DRL supply, Zap-Lok, install 2200ft 2. Shallow bury trench 200ft 3. Clean-up and revegetation 2200ft 4. Water line hydrant coupling supply and install 18ea 5. Install one water valve top and tie into drain at bottom 6. Tie-ins 12ea 7. Replace valve station foundation, remove, and reinstall valving Brookside Trail: 1. Water 4 .237W DRL supply, Zap-Lok, install 950ft 2. Shallow bury trench 300ft 3. Clean-up revegetation 950ft 4. Water line coupling supply and install 10ea 5. Air line coupling supply and install 3ea 6. Install two drain valves at bottom 2ea 7. Tie-ins 4ea 8. Upper valve station tie in 1ea 9. Extend lines 150 down from current location 150ft Question Deadline 07/13/2022 at 4:00 PM ET |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |