Similar Projects
Carmichael Gymnasium Addition and Renovation
Post-Bid
$45,000,000 est. value
Raleigh, NC 27607

NC State Bureau of Mines Renovation
Renovation
Post-Bid
Less than $3,598,000 est. value
Raleigh, NC

RTP Campus - General Classroom Building 2
Results
Less than $43,994,800 est. value
Raleigh, NC

Dabney Hall HVAC Evaluation and Upgrade Phase 2
Renovation - 139,000 SF
Results
Less than $2,700,000 est. value
Raleigh, NC

Plant Sciences Building
New Construction - 184,815 SF
Construction
Less than $160,200,000 est. value
Raleigh, NC

Academic Success Center at DH Hill Library
Renovation - 40,000 SF
Construction
$9,300,000 est. value
Raleigh, NC

Design Build for Restoration of Memorial Belltower
Post-Bid
Less than $6,100,000 est. value
Raleigh, NC

B104 Lab Renovation CVM Main Building
Renovation - 7,700 SF
Results
Raleigh, NC

Engineering Building Oval
New Construction - 227,000 SF
Construction
Raleigh, NC 27606

Esthetics Cosmetology Lab Renovation
Renovation
Post-Bid
Raleigh, NC

Dabney Hall Evaluation and Upgrade Phase 2 METRIC Renovation
Renovation
Results
Raleigh, NC

WTCC - Building NR - Automotive and Collision Repair Facility
New Construction - 100,653 SF
Construction
Raleigh, NC 27616

NC State High Bay
Renovation, Addition - 9,898 SF
Post-Bid
Raleigh, NC 27606

NCSU Fountain Dining Hall
Renovation
Results
Raleigh, NC 27695

Wake Tech Community College RT2
New Construction - 66,000 SF
Construction
Morrisville, NC 27560

Last Updated 08/29/2019 10:57 AM
Project Title

Lab and Building System Modifications Varsity Research

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27606   (Wake County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project will improve the HVAC system and provide minor lab renovations in the Varsity Research Building. The HVAC renovation will include replacing VAV boxes and local controls in Modules 1, 5, 8, 9 and 10. The renovations in the 15,200 GSF area of Modules 8 - 10 will consolidate the College of Sciences into two modules, accommodate programmatic needs of the research programs, and improve the HVAC infrastructure.
Details 1 College/University, 15,200 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents